FIELD: oil production industry. SUBSTANCE: method can be used at late stage of developing deposit. At high flooding of recovered product that is when it reaches 95%, wells are stopped. Undertaken is temporary isolation of water inflows by injection of viscous-resilient compound. Then wells are started for operation. Output and flooding are assessed. Separated are wells in which flooding is reduced by more than 3%. In case of increased flooding, they are subjected to selective isolation proper. For this purpose, initially injected is viscous-resilient compound, then cement slurry is injected. After drilling through hardened cement stone, undertaken is final shooting of perforation holes in oil part of bed. Bottom-hole of sump is remained by 5 m lower than final perforation holes. Well is completed and brought in operation. Application of aforesaid method improves reliability of isolation of water inflows and reduces flooding of products. EFFECT: higher efficiency. 5 cl
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ISOLATION OF WATER INFLOWS IN OPERATIONAL WELLS | 1999 |
|
RU2144136C1 |
WELL KILLING METHOD | 1999 |
|
RU2136855C1 |
METHOD OF INCREASE OF OIL RECOVERY FROM OIL FIELDS DEVELOPED BY FLOODING | 1999 |
|
RU2136862C1 |
METHOD FOR ISOLATION OF GAS INTERFLOWS IN HOLE CLEARANCE | 1998 |
|
RU2126880C1 |
METHOD OF PERFORMING REPAIR JOBS IN DEVELOPMENT WELL | 1998 |
|
RU2121559C1 |
COMPOUND FOR SELECTIVE ISOLATION OF WATER INFLOWS IN OIL WELLS | 1999 |
|
RU2136878C1 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
METHOD OF CLEANING THE PRODUCING FORMATION CHANNELS | 1998 |
|
RU2121563C1 |
METHOD FOR KILLING DEVELOPMENT WELL | 1997 |
|
RU2099511C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
Authors
Dates
1999-09-10—Published
1999-01-05—Filed