FIELD: detection of disturbed sealing of flow string in injection wells with no tubing. SUBSTANCE: measurement and registration of temperature are carried out along well bore in injection and in the course of changing over from injection to stationary conditions of fluid withdrawal with some time interval, and obtained thermograms are compared. In each interval of detected temperature anomaly, two additional measurements are carried out. In this case, the first measurement is carried out at quasi-stationary distribution of temperature in well bore in course of injection. After shut-in of well and ceasing of injection, the second measurement is carried out for not more than 2-5 min. Disturbed sealing of flow string is detected by the form of temperature anomaly in the first and second measurements or by absence of anomaly during the first measurement and by the presence of anomaly during the second measurement. EFFECT: higher accuracy in detection of points of disturbed sealing of flow string. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INVESTIGATING INJECTION WELLS (VERSIONS) | 1997 |
|
RU2121571C1 |
METHOD OF INJECTION WELLS RESEARCH (VERSIONS) | 1999 |
|
RU2154161C1 |
PROCESS OF EXAMINATION OF INJECTION HOLES ( VERSIONS ) | 1998 |
|
RU2151866C1 |
METHOD OF DETERMINATION OF FLUID FLOW IN ANNULAR SPACE OF INJECTION WELL | 2000 |
|
RU2171373C1 |
DOWNHOLE TEMPERATURE PROBE ASSEMBLY (VARIANTS) | 2004 |
|
RU2303130C2 |
METHOD OF ACTIVE TEMPERATURE LOGGING OF OPERATING WELLS (VERSIONS) | 2001 |
|
RU2194160C2 |
METHOD FOR IDENTIFICATION OF BEHIND-CASING FLOW IN WELL WITHIN INTERVALS COVERED BY TUBING STRINGS | 2014 |
|
RU2569391C1 |
METHOD OF CHECKING FOR TIGHTNESS OF INJECTION WELL EQUIPPED WITH TUBING | 2000 |
|
RU2166628C1 |
METHOD OF DETERMINING BEHIND COLUMN CURRENTS IN INJECTION HOLES | 0 |
|
SU1573155A1 |
METHOD OF INVESTIGATING INJECTION WELLS | 0 |
|
SU1359435A1 |
Authors
Dates
1998-11-10—Published
1997-08-13—Filed