FIELD: construction of pipelines; mounting and hydrostatic test of pipelines. SUBSTANCE: device includes load-carrying cross-piece, grips for mounted and laid before pipes, L-shaped bar which carries test unit provided with rollers for moving over pipe, and unit for pipe joining. Grip of laid before pipe is inside-pipe one and located on L-shaped bar. Test unit consists of body having diaphragms which form pressure chambers together with body, sealing rings which form test chamber located between pressure chambers. EFFECT: extended functional potentialities, efficient joining of inserted-joint and non-inserted-joint pipes and reduced consumption of water for testing. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR MOUNTING AND DISMANTLING INSERTED-JOINT PIPES | 1996 |
|
RU2122077C1 |
METHOD OF LAYING PIPE LINES AND ASSEMBLY EQUIPMENT USED FOR REALIZATION OF THIS METHOD | 1997 |
|
RU2123630C1 |
DEVICE FOR MOUNTING FLARED PIPES | 0 |
|
SU1520203A1 |
DEVICE FOR TREATMENT OF OIL-CONTAINING SEWAGE | 1996 |
|
RU2116975C1 |
METHOD OF DETERMINING THE WORKING MEMBER POSITION IN GROUPS | 1996 |
|
RU2122620C1 |
DEVICE FOR MOUNTING SOCKET PIPES | 0 |
|
SU1638275A1 |
DEVICE FOR LAYING AND STAKING-ON OF PIPELINE FROM INSERTED-JOINT PIPES | 0 |
|
SU1171631A1 |
DEVICE FOR ASSEMBLING AND TESTING SPIGOT-AND-SOCKET PIPINGS | 0 |
|
SU1663134A1 |
0 |
|
SU558089A1 | |
0 |
|
SU440479A1 |
Authors
Dates
1998-11-20—Published
1996-03-19—Filed