FIELD: construction engineering. SUBSTANCE: this relates to construction of railway and tramway lines. According to method, blanks of wood are initially pressed in cool condition up to density of 800-1000 kg/cu.m. After that, blanks are dried, cooled, and impregnated with antiseptic material under pressure of 10-30 atm. of compressed air at temperature of 60-70 C during 5-10 min. Then, ready liners are coated with moisture-protecting material. Application of aforesaid method allows for improving quality of ready articles with reduction of power needed for their production. EFFECT: higher efficiency. 2 ex
Title | Year | Author | Number |
---|---|---|---|
CONCRETE SLEEPER | 1992 |
|
RU2042758C1 |
METHOD OF OBTAINING THE PRESSED ARTICLES FROM THE WOOD | 1992 |
|
RU2041809C1 |
METHOD OF MAKING BUSHES OF WOOD | 1992 |
|
RU2041805C1 |
METHOD OF OBTAINING PLAIN BEARING WITH SHELLS MADE OF WOOD AND DEVICE FOR ITS REALIZATION | 1992 |
|
RU2041810C1 |
METHOD OF WOOD TIE MANUFACTURE | 2000 |
|
RU2185958C1 |
METHOD FOR PRODUCTION OF MODIFIED WOOD | 2007 |
|
RU2346809C2 |
METHOD OF PRODUCING ACETYLATED WOOD | 2007 |
|
RU2391202C1 |
METHOD OF PRODUCING MODIFIED WOOD | 2019 |
|
RU2712521C1 |
OIL IMPREGNATING ANTISEPTIC FOR WOOD PRESERVATION (VERSIONS) | 2007 |
|
RU2377121C2 |
METHOD OF PRODUCING MODIFIED WOOD | 0 |
|
SU1546261A1 |
Authors
Dates
1998-12-27—Published
1994-02-15—Filed