FIELD: construction engineering. SUBSTANCE: reinforcement prestressing device has following components: hydraulically-powered front collet-type clamp and rear collet-type clamp intended for gripping bunches of reinforcement wires, anchoring holder, stopping holder, hydraulic cylinder with case and pistons for tensioning wire bunches and for pressing in collet-type clamps, support which is mounted on hydraulic cylinder case with possibility of rotation, removable stop for depressing which interacts with rear end face of stopping holder, unit for fixing holder and wire bunch tensioning piston respectively with anchor holder and replaceable depressing stop. Pressing-in piston is located inside bunch tensioning piston and is made with passages for wire bunches. Aforesaid embodiment of device features simple design combined with reduced labour-intensity in operation. EFFECT: higher efficiency. 1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
GEAR TO STRESS BUNDLES OF STRAND REINFORCEMENT OF FERROCONCRETE STRUCTURES | 1998 |
|
RU2151249C1 |
DEVICE FOR STRESSING OF STRAND REINFORCEMENT BUNDLES IN PRESTRESSED REINFORCED CONCRETE STRUCTURES | 2009 |
|
RU2404336C1 |
DEVICE FOR TENSIONING REINFORCEMENT BUNDLES | 1997 |
|
RU2094580C1 |
DEVICE FOR PRODUCTION OF PRESTRESSED REINFORCED CONCRETE ARTICLES | 2013 |
|
RU2576675C2 |
METHOD TO ERECT STRESSED REINFORCED CONCRETE STRUCTURES AND DEVICE FOR ITS REALISATION | 2014 |
|
RU2567569C2 |
DEVICE TO MANUFACTURE PRESTRESSED REINFORCED CONCRETE PRODUCTS | 2011 |
|
RU2475610C2 |
ANCHORING DEVICE | 2016 |
|
RU2661514C2 |
METHOD FOR CONSTRUCTION OF REINFORCED CONCRETE SHELL AND SHELL | 2010 |
|
RU2505652C2 |
MANUFACTURING METHOD OF SPOOL-TYPE VALVE FOR HYDRAULIC LOAD-BEARING ELEMENT, AND SPOOL-TYPE VALVE | 2011 |
|
RU2493443C2 |
DEVICE FOR TENSIONING STRAND-TYPE REINFORCEMENTS | 0 |
|
SU842178A1 |
Authors
Dates
1998-12-27—Published
1995-04-07—Filed