FIELD: construction.
SUBSTANCE: shell includes pre-stressed reinforced concrete wall, rope bundles in ductubes, anchor device where each of rope ends is fixed. The shell is equipped with additional anchor devices fixed uniformly along outer surface of the shell at length of rope bundles. Ropes are placed in a bundle by rows and each row of ropes is fixed in a respective anchor device. Method for construction of the shell is suggested.
EFFECT: increasing operational reliability, durability and repairability of the structure.
7 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT STRESSED REINFORCED CONCRETE STRUCTURES AND DEVICE FOR ITS REALISATION | 2014 |
|
RU2567569C2 |
METHOD TO MANUFACTURE PRESTRESSED REINFORCED CONCRETE STRUCTURES AND MONOSTRAND | 2009 |
|
RU2427686C2 |
PRESTRESSED FERROCONCRETE CONSTRUCTIONS | 1997 |
|
RU2131010C1 |
DEVICE FOR STRESSING OF STRAND REINFORCEMENT BUNDLES IN PRESTRESSED REINFORCED CONCRETE STRUCTURES | 2009 |
|
RU2404336C1 |
METHOD TO TIGHTEN CABLES | 2014 |
|
RU2548267C1 |
PROTECTIVE SHELL OF NPP REACTOR COMPARTMENT | 2016 |
|
RU2639346C1 |
DEVICE FOR PASSING BEAMS OF REINFORCING STRANDS AND METHOD FOR ITS IMPLEMENTATION | 2022 |
|
RU2795727C1 |
ANCHOR DEVICE AND METHOD OF CALIBRATION OF FORCE MEASURING UNIT THEREOF | 2018 |
|
RU2731431C2 |
DEVICE FOR PRODUCTION OF PRESTRESSED REINFORCED CONCRETE ARTICLES | 2013 |
|
RU2576675C2 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
Authors
Dates
2014-01-27—Published
2010-03-22—Filed