FIELD: construction.
SUBSTANCE: invention relates to construction, namely, to pre-stressing systems of bundles from prestressed reinforcement bars of building structures. Anchor device of the prestressing system of bundles from prestressed reinforcement includes bundles of reinforcing ropes located in the duct tube, the ends of which are placed in the cavity of the support shell and fixed in the anchor cage, a device for injecting the duct tube with a cement mortar, a spiral of indirect reinforcement of concrete of an anchor zone placed on a shell, an injection cover with a branch pipe. On the outer surface of the support shell there are guides parallel to its longitudinal axis contacting the inner surface of the spiral of indirect reinforcement of concrete of the anchor zone, inside it there are inclined slots located equidistantly relative to its axis for arrangement of bundles of reinforcing ropes.
EFFECT: improving the quality of the constructed structure while reducing labour intensity, the cost of its production, and increasing its reliability and durability.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BUNDLED BARS MADE OF HIGH STRENGTH ROPES AND METHOD FOR MANUFACTURING PRE-STRESSED REINFORCED CONCRETE STRUCTURES USING BUNDLED BARS | 2001 |
|
RU2178045C1 |
DEVICE FOR PASSING BEAMS OF REINFORCING STRANDS AND METHOD FOR ITS IMPLEMENTATION | 2022 |
|
RU2795727C1 |
ANCHOR DEVICE (ALTERNATIVES) | 2001 |
|
RU2178485C1 |
METHOD TO ERECT STRESSED REINFORCED CONCRETE STRUCTURES AND DEVICE FOR ITS REALISATION | 2014 |
|
RU2567569C2 |
PRESTRESSED FERROCONCRETE CONSTRUCTIONS | 1997 |
|
RU2131010C1 |
METHOD FOR TEMPORARY SPAN STRUCTURE SECURING DURING ASSEMBLAGE THEREOF WITH THE USE OF TEMPORARY STRESSED HIGH-STRENGTH REINFORCEMENT BUNDLES | 2004 |
|
RU2249067C1 |
METHOD FOR ERECTION OF MONOLITHIC PRESTRESSED REINFORCED CONCRETE FRAME OF BUILDING | 2008 |
|
RU2384675C1 |
METHOD FOR ERECTION OF MONOLITHIC PRESTRESSED REINFORCED CONCRETE FRAME OF BUILDING | 2008 |
|
RU2382852C1 |
MONOLITHIC SOLID PRESTRESSED PLATE-AND-RIB BRIDGE SPAN STRUCTURE | 2004 |
|
RU2249068C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
Authors
Dates
2024-10-30—Published
2024-04-10—Filed