FIELD: civil engineering. SUBSTANCE: lifting crane has load carrying vertical telescopic uprights consisting of lower part and upper part mounted on lower part. Upper parts are rigidly connected in pairs on ends of cross to which longitudinal beam is connected. Drive with load-gripping device is installed on longitudinal beam. The latter is connected by end with additional vertical upright owing to which labour input in mounting and demounting of crane is reduced thanks to reduction of number of crane members. EFFECT: enlarged operating capabilities. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR LIFTING LOAD ONTO OVERHEAD CRANE | 2023 |
|
RU2814140C1 |
DEVICE FOR DELIVERING LOADS INTO WINDOW OPENINGS OF BUILDINGS | 0 |
|
SU1654252A1 |
MOUNTED PLATFORM FOR WORK AT FRONTS OF BUILDINGS | 1995 |
|
RU2116413C1 |
UNIVERSAL COLLAPSIBLE MOBILE GANTRY CRANE AT CRANE TRESTLE | 2012 |
|
RU2503611C2 |
CARRIER OF SUPER CONTAINERS WITH LABELLED AND ECOLOGICALLY UNSAFE CARGOES | 2013 |
|
RU2550940C1 |
COVERED STADIUM | 2012 |
|
RU2507357C1 |
CRANE FOR LIFTING AND DELIVERING LOADS INTO WINDOW APERTURE IN BUILDING | 1991 |
|
RU2048423C1 |
0 |
|
SU131058A1 | |
RECEIVING SITE FOR LOADS FEEDING IN SPACE OF BUILDING | 1991 |
|
RU2016989C1 |
CRANE FOR CARGO LIFTING AND FEEDING TO HOUSE WINDOW APERTURE | 2006 |
|
RU2323871C2 |
Authors
Dates
1999-04-10—Published
1998-03-31—Filed