FIELD: oil and gas production industry. SUBSTANCE: method is used in recovery of liquid hydrocarbons especially from low-output wells with large gas factor and high saturation pressures. In compliance with method, setup of pump-compressor pipes in its lower part is provided with non-return valve or regulator of bottom-hole pressure. Packer is installed higher in bore-hole. Located under packer and above packer are well chambers. Installed in upper chamber is circulation valve, and installed in lower chamber is gas-lift valve. Gas-lift valve is preset so that it opens and bypasses gas into string of pump-compressor pipes at maximal values of gas pressure in annular space and of liquid pressure in string of pump-compressor pipes at valve location place. Gas pressure in annular space of well must be higher than liquid pressure in string of pump-compressor pipes at given place. Application of aforesaid valve ensures efficient utilization of well recovering capacity with prolongation of natural period of its gushing. EFFECT: higher efficiency. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF GAS-LIFT OIL PRODUCTION WITH AUTOMATIC CONTROL OF WELL PRODUCTION POTENTIALITIES | 2000 |
|
RU2208135C2 |
METHOD OF PERIODIC RUNNING OF WELLS WITH TWO END PRESSURE CONTROLLERS | 1997 |
|
RU2157448C2 |
PROCESS OF BUSTER-LIFT RUNNING OF WELLS | 1997 |
|
RU2157449C2 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF SEVERAL PAYOUT BEDS AND INSTALLATION OF WELL FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2334867C1 |
WELLHEAD PRESSURE CONTROLLER | 1997 |
|
RU2158359C2 |
METHOD OF OPERATION OF WELL PUMPS WITH AUTOMATICALLY MAINTAINING PRESET DYNAMIC LEVEL OF PUMPING OUT LIQUID MEDIUM IN WELL (VERSIONS) | 2003 |
|
RU2235904C1 |
HYDRAULIC PULSE GENERATOR OF ELASTIC WAVES | 1998 |
|
RU2157452C2 |
FLYING SCRAPER PIG | 1998 |
|
RU2158355C2 |
OIL-WELL ELECTROHYDRAULIC PUMPING UNIT | 2003 |
|
RU2255245C2 |
PARKER | 2008 |
|
RU2379470C1 |
Authors
Dates
1999-04-20—Published
1997-03-04—Filed