FIELD: oil and gas industry. SUBSTANCE: method is realized by means of special arrangement of tubing string which includes plunger, lower and upper shock absorbers, end pressure controllers. Face and well-head pressure controllers are so tuned that face pressure controller operates and opens first when face pressure achieves calculated value providing for arrival of pool fluid into space of tubing string. With rise of buffer pressure to calculated value well-head pressure controller operates and opens ensuring coming of pool fluid into oil collector. Both of them are open providing for ingress of pool fluid into oil collector. They are open simultaneously till face pressure value falls to calculated value, after it face pressure controller shuts off and well-head pressure controller shuts off when buffer pressure lowers to calculated value. EFFECT: more complete output of stock, substantially prolonged natural gushing of wells without transfer to mechanized process of production of hydrocarbons. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPERATION OF GUSHER WELLS WITH USE OF GAS-LIFT PHENOMENON OF ASSOCIATED OIL GAS | 1997 |
|
RU2129208C1 |
PROCESS OF BUSTER-LIFT RUNNING OF WELLS | 1997 |
|
RU2157449C2 |
METHOD OF GAS-LIFT OIL PRODUCTION WITH AUTOMATIC CONTROL OF WELL PRODUCTION POTENTIALITIES | 2000 |
|
RU2208135C2 |
WELLHEAD PRESSURE CONTROLLER | 1997 |
|
RU2158359C2 |
FLYING SCRAPER PIG | 1998 |
|
RU2158355C2 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF SEVERAL PAYOUT BEDS AND INSTALLATION OF WELL FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2334867C1 |
METHOD OF OPERATION OF WELL PUMPS WITH AUTOMATICALLY MAINTAINING PRESET DYNAMIC LEVEL OF PUMPING OUT LIQUID MEDIUM IN WELL (VERSIONS) | 2003 |
|
RU2235904C1 |
HYDRAULIC PULSE GENERATOR OF ELASTIC WAVES | 1998 |
|
RU2157452C2 |
OIL-WELL ELECTROHYDRAULIC PUMPING UNIT | 2003 |
|
RU2255245C2 |
SUCTION VALVE OF SUBMERSIBLE PUMP | 2004 |
|
RU2263228C1 |
Authors
Dates
2000-10-10—Published
1997-03-04—Filed