FIELD: oil and gas production industry. SUBSTANCE: according to method, delivery of recovered liquid from wells to collecting stations, and secondary injection back into well of gas separated from recovered liquid products and then used for gassing of products recovered through string of pipes is effected by means of one or two pump-compressors which are incorporated in pumping jack assembly. Pump-compressors are brought in reciprocating motion by balancer of pumping jack. Pump-compressor is installed after reduction unit which runs asynchronously with deep-well pump and before rod which operates synchronously. Created are mutually equalizing parts loaded by weight of deep-well pumping equipment. Employed is tubular device for measuring output of well products. At continuous supply of well with gas separated in gas separator, well products allow for utilizing pressure developed by pump-compressor as equalizing force. Application of aforesaid method and device widens functional potentialities in using deep-well sucker-rod pumping assemblies. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING OIL DEPOSITS AND BLOCK COMPLEX SYSTEM OF PLANTS FOR METHOD EMBODIMENT | 1999 |
|
RU2189439C2 |
METHOD AND DEVICE FOR PUMPING OUT GAS-FLUID MIXES, GASES AND FLUIDS WITH UTILIZATION OF NATURAL POTENTIAL ENERGY | 1997 |
|
RU2134772C1 |
METHOD AND DEVICE FOR LIFTING GAS-LIQUID MIXTURE IN WELLS | 1994 |
|
RU2114282C1 |
METHOD OF RECOVERY OF WELL PRODUCTS AND DEEP-WELL PUMPING DEVICES FOR METHOD EMBODIMENT (VERSIONS) | 1999 |
|
RU2189433C2 |
METHOD FOR MEASUREMENT OF WELL FLOW RATE AND DEVICE FOR ITS EMBODIMENT | 1992 |
|
RU2069264C1 |
DOWNHOLE SUCKER-ROD PUMPING UNIT | 1995 |
|
RU2100578C1 |
SUCKER-ROD PUMPING UNIT FOR OPERATION OF MARGINAL WELLS | 1995 |
|
RU2100579C1 |
PLANT FOR MEASURING AND STUDY OF WELL PRODUCTS | 1995 |
|
RU2100596C1 |
METHOD FOR LIFTING GAS-FLUID MIXTURE FROM METALS AND DEEP-WELL PUMPING UNIT FOR ITS EMBODIMENT | 1995 |
|
RU2099508C1 |
METHOD FOR MEASURING WELL OPERATION PARAMETERS AND GROUP UNIT FOR ABOVE METHOD IMPLEMENTATION | 2003 |
|
RU2263208C2 |
Authors
Dates
1999-04-27—Published
1996-04-03—Filed