FIELD: aluminum production. SUBSTANCE: invention refers to production of aluminum by electrolysis of melted-down cryolite salts in electrolyzer designed for 250-320 kA with their transverse placement in electrolyzer body. In agreement with invention each package of buses in arrangement bending around faces of cathode enclosure of electrolyzer transmits from 35 to 50% of current of input side of electrolysis bath. 35 to 50% of current of input side passes correspondingly through packages of buses bending around cathode enclosure. Proposed bus arrangement includes anode stands located along longitudinal sides of electrolyzer, collecting buses with cathode escapements, collecting buses of output side, packages of cathode buses placed under electrolyzer bottom and packages enveloping faces of electrolyzer. Extreme stands are linked to extreme collecting buses of input side by means of packages of buses and to collecting buses of output side. Bus arrangement operates in the following way: current is transmitted to collecting cathode buses with the aid of cathode escapements and goes to stands of electrolyzer next in series over packages of buses. In this case 0-15% current of input side is transmitted over some packages and 35-50% is sent over other packages. Equal quantities of current passes through anode stands. Each stand feeds anode bus in certain point around which equal number of anodes is positioned in symmetry. EFFECT: increased output of metal by given current due to decreased effect of magnetic field on cathode aluminum. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BUSBARS FOR ALUMINUM CELLS WITH INCREASED POWER | 2002 |
|
RU2244045C2 |
WHEELS FOR ALUMINIUM ELECTROLYSERS OF LARGE CAPACITY | 2017 |
|
RU2643005C1 |
LEAD FOR ALUMINIUM ELECTROLYTIC CELL OF HIGHER POWER | 2006 |
|
RU2328555C2 |
BUS ARRANGEMENT OF ELECTROLYZER FOR PRODUCTION OF ALUMINUM | 1991 |
|
RU2107754C1 |
ALUMINIUM ELECTROLYZER BUSBAR | 1992 |
|
RU2009275C1 |
MODULE-TYPE BUS ARRANGEMENT OF ALUMINUM PRODUCING ELECTROLYZERS | 2005 |
|
RU2288976C1 |
GEAR TO SUPPLY POWER TO ALUMINUM ELECTROLYZERS CONNECTED IN SERIES | 2000 |
|
RU2187584C2 |
BUS ARRANGEMENT OF ELECTROLYZER FOR PRODUCTION OF ALUMINUM | 1999 |
|
RU2179202C2 |
MODULAR BUSBAR FOR SERIES OF ALUMINUM ELECTROLYSIS CELLS | 2017 |
|
RU2678624C1 |
BUSBARS OF HIGH-POWER ALUMINUM CELLS | 2004 |
|
RU2255148C1 |
Authors
Dates
1999-07-10—Published
1995-09-12—Filed