FIELD: mining industry, charging of flooded holes going down with water-carrying explosives. SUBSTANCE: process of charging of flooded holes going down includes installation of hoses for supply of components of water-carrying explosives at different levels of depth of hole and separate supply of solid and liquid components of water-carrying explosive. Solid component of water-carrying explosive is supplied into central part of hole and liquid component is fed to periphery. Hoses for supply of liquid component are positioned in hole at level below level of installation of hose for supply of solid component by 0.5-1.0 diameter of hole. EFFECT: increased efficiency of charging of holes thanks to uniform distribution of components of water-carrying explosive over entire length of string of charge in hole and over area of hole. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF LOADING OF DOWNGOING HOLES WITH WATER-CARRYING EXPLOSIVES (VERSIONS) | 1999 |
|
RU2146037C1 |
METHOD OF CHARGING OF FLOODED BOREHOLES WITH WATER- CONTAINING SUSPENSION EXPLOSIVES | 1993 |
|
RU2097678C1 |
PROCESS OF CHARGING OF DESCENDING HOLES WITH EXPLOSIVE | 1997 |
|
RU2131584C1 |
DEVICE FOR MIXING AND TRANSPORTING COMPONENTS AND WELL CHARGE | 1991 |
|
RU2006736C1 |
METHOD TO CHARGE WATER DOWN-HOLES | 2006 |
|
RU2419064C2 |
METHOD OF CHARGING OF DESCENDING BLAST HOLES WITH HOT-FLOWING WATER-CONTAINING EXPLOSIVES | 1994 |
|
RU2100773C1 |
METHOD FOR CHARGING OF FLOODED WELLS WITH WATER-CONTAINING EXPLOSIVE | 1998 |
|
RU2153148C1 |
METHOD FOR MANUFACTURE AND MECHANIZED DEEP-HOLE CHARGING WITH EMULTION EXPLOSIVE MIXTURE | 2001 |
|
RU2208219C1 |
METHOD FOR CHARGING-IN OF DEEP-HOLE AND DESIGN OF DEEP-HOLE CHARGE | 2000 |
|
RU2156431C1 |
METHOD FOR PRODUCTION OF WATER-CONTAINING EXPLOSIVES | 2000 |
|
RU2204544C2 |
Authors
Dates
1999-07-10—Published
1994-12-27—Filed