FIELD: blasting operations in mining industry and construction with employment of hot-flowing water-containing explosives in rocks of any degree of water content, containing inclusions of sulfides. SUBSTANCE: prior to placement of hot-flowing water-containing explosive in the blast hole, the blast hole face is filled with a layer of granulated material that is inert with respect to hot-flowing water-containing explosive. Natural quartz sand is preferable for use as granulated material. EFFECT: facilitated procedure. 2 cl
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF CHARGING OF DESCENDING HOLES WITH EXPLOSIVE | 1997 |
|
RU2131584C1 |
METHOD OF CHARGING OF FLOODED DOWNCAST WELLS WITH WATER-CONTAINING EXPLOSIVES | 1995 |
|
RU2088893C1 |
PROCESS OF LOADING OF DOWNGOING HOLES WITH WATER-CARRYING EXPLOSIVES (VERSIONS) | 1999 |
|
RU2146037C1 |
METHOD FOR CHARGING OF FLOODED WELLS WITH WATER-CONTAINING EXPLOSIVE | 1998 |
|
RU2153148C1 |
METHOD FOR CHARGING OF VERTICAL AND INCLINED HOLES | 1999 |
|
RU2159405C1 |
METHOD FOR DRILLING AND BLASTING OPERATIONS IN OPEN CUTS | 1999 |
|
RU2154254C1 |
METHOD OF PREPARING WATER-CONTAINING EXPLOSIVE | 1998 |
|
RU2145589C1 |
PROCESS OF BREAKING OF ROCKS ON EARTH SURFACE BY BLAST | 1995 |
|
RU2095746C1 |
METHOD FOR ROCK BREAKING | 1992 |
|
RU2043497C1 |
PROCESS OF CHARGING OF HOLES GOING DOWN FOR SPARING EXPLOSION AND DEVICE FOR ITS IMPLEMENTATION | 1998 |
|
RU2133007C1 |
Authors
Dates
1997-12-27—Published
1994-01-26—Filed