FIELD: gas industry. SUBSTANCE: method comes to drilling injection-development wells equipped with flow tubings, injection into pay-out bed of gas and extraction of gas. Injection-development wells are drilled with horizontal termination of bore hole and are arranged in clusters with vertical well. First pay-out bed and partially underlaying water bearing stratum are drilled in and local characteristics of bed are determined. Basing on obtained data, well profile and program of injection-development wells with horizontal termination of bore hole are defined more accurately. Then 3-8 injection-development wells with horizontal termination of bore hole are drilled. Horizontal termination of bore holes are arranged along radii from center of cluster and are lined with filters length of each horizontal termination of bore hole being 250 m and more. Point of entry of each horizontal termination of bore hole into top of pay-out bed is arranged at a distance not less that 100 m from vertical well bore hole which is used as injection well. EFFECT: reduced building costs. 2 cl, 3 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND GAS STORAGE CREATION IN DEPLETED OIL-AND-GAS DEPOSIT | 2005 |
|
RU2301895C2 |
METHOD FOR EXTRACTING LAYER-ZONE-WISE HETEROGENEOUS FORMATION OF HIGHLY VISCOUS OIL OR BITUMEN | 2006 |
|
RU2295030C1 |
METHOD OF OPERATION OF A MULTIPLATE UNDERGROUND GAS STORAGE | 2017 |
|
RU2655259C1 |
METHOD FOR THERMAL GASEOUS HYDRATE FIELD DEVELOPMENT | 2005 |
|
RU2306410C1 |
METHOD OF COMPLETING AND OPERATION OF WELL OF UNDERGROUND GAS STORAGES | 2018 |
|
RU2686259C1 |
METHOD OF DEVELOPMENT OF MULTILAYER OIL DEPOSITS | 2015 |
|
RU2584190C1 |
METHOD OF SUPER-VISCOUS OIL FIELD DEVELOPMENT | 2017 |
|
RU2663627C1 |
PROCEDURE FOR DEVELOPMENT OF GAS-CONDENSATE DEPOSIT WITH BIG GAS COLUMN IMPLEMENTING CYCLING PROCESS | 2010 |
|
RU2434123C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSITS | 2008 |
|
RU2398104C2 |
METHOD OF MULTI-LAYERED OIL FIELD DEVELOPMENT WITH PRESENTS OF HIGHLY PERMEABLE INTERLAYER USING HYDRAULIC FRACTURING | 2007 |
|
RU2374435C2 |
Authors
Dates
1999-09-10—Published
1998-08-07—Filed