FIELD: oil and gas production industry. SUBSTANCE: unit is intended for cleaning and completion of wells, including oil and gas wells. Unit has string of pump-compressor pipes with shut-off and drain valve, packer, and filter with tail-piece located below packer. Positioned above packer is receiving chamber which is hydraulically connected with filter space through successively installed release valve and non-return valve. Introduced in string of pump-compressor pipes between receiving chamber and shut-off and drain valve are working fluid cleaning assembly and jet pump. Receiving chamber in its upper part has damping valve which isolates receiving chamber from space in upper part of string of pump-compressor pipes. Cleaning assembly has filter-settler with inlet tangential passages for coarse cleaning, and filtering pipe union for medium cleaning. Movable parts of packer and release valve in initial position are fixed by shear members. Receiving chamber is under atmospheric pressure. After installing packer, release valve operates, depression is created. Well liquid flows into receiving chamber and then is carried by jet pump to ground surface. Application of aforesaid embodiment of unit cuts time and improves quality of operations for cleaning and/or completion of well. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR HYDRAULIC-IMPACT TREATMENT OF BED | 1996 |
|
RU2119581C1 |
METHOD OF OPERATION OF WELL AND PERFORATOR FOR OIL WELL TUBING | 1998 |
|
RU2126496C1 |
DEVICE FOR CLEANING HORIZONTAL WELLS | 2002 |
|
RU2246607C2 |
PLANT FOR HYDRODYNAMIC STIMULATION OF FORMATION | 1999 |
|
RU2157886C1 |
DEVICE FOR HYDRO-IMPULSE EFFECT ON FACE-ADJACENT AREA OF BED | 2002 |
|
RU2241108C2 |
DEVICE FOR STIMULATION AND CLEANING OF BOTTOMHOLE FORMATION ZONE | 2001 |
|
RU2213859C2 |
TREATMENT METHOD OF BOTTOM-HOLE FORMATION ZONE, AND DOWNHOLE SYSTEM FOR ITS IMPLEMENTATION | 2011 |
|
RU2485299C1 |
IMPLOSIVE DEVICE TO CLEAN WELLS ( VERSIONS ) | 1998 |
|
RU2160825C2 |
RESERVOIR CLEANING AND COMPLETION DEVICE | 2014 |
|
RU2568615C1 |
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF | 2006 |
|
RU2345214C2 |
Authors
Dates
1999-09-10—Published
1998-04-29—Filed