METHOD FOR COMBINATION DEVELOPMENT OF MINERAL DEPOSITS Russian patent published in 1999 - IPC

Abstract RU 2137921 C1

FIELD: mining industry. SUBSTANCE: method can be used in development of steeply descending ore bodies such as kimberlite bodies. According to method, working of deposit to design depth is carried out by opencast method with bringing burden to external dump and bringing ore to processing plant. Left in one of quarry sites is temporary pillar consisting of ore pillar and burden pillar. After reaching design depth, inclined shaft is drilled in side which is opposite to side with left reserve. Ore is mined under quarry bottom through drilled shaft. Work is carried out to 60-100 m depth by caving with open worked-out space. Caved ore from underground drift is transported through inclined shaft and further over berms to concentration plant. In working of temporary pillar, part of overburden is carried to external dump, and remaining part is moved by gravity to bottom of worked-out space until restoring of initial quarry bottom. Ore is worked in side and carried to processing plant. Ore left under pillar is worked through inclined shaft by same technology. Inclined shaft is lengthened by one more pitch and ore is worked through it from zone under overlying rock matter. EFFECT: higher efficiency. 1 cl, 1 dwg, 1 tbl

Similar patents RU2137921C1

Title Year Author Number
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD 2008
  • Efimov Aleksandr Ivanovich
  • Pis'Mennyj Andrej Vasil'Evich
  • Cherepnov Andrej Nikolaevich
  • Akishev Aleksandr Nikolaevich
  • Bakhtin Valerij Aleksandrovich
  • Babaskin Sergej Leonidovich
RU2382200C1
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES 2013
  • Akishev Aleksandr Nikolaevich
  • Kozhemjakin Aleksej Aleksandrovich
  • Babaskin Sergej Leonidovich
  • Cherepnov Andrej Nikolaevich
  • Federjaev Oleg Vladimirovich
RU2540735C1
METHOD OF REFINEMENT OF DEEP KIMBERLITE QUARRIES 2017
  • Androsov Artur Dmitrievich
  • Shubin Grigorij Vladimirovich
  • Androsov Artur Arturovich
  • Petrova Lyubov Vladimirovna
RU2661769C1
PROCESS OF DEVELOPMENT OF STEEPLY DEEPING DEPOSITS WHILE WORKING DEEP FLOORS IN STRIPPING 2001
  • Zobnin V.I.
  • Chizhov E.A.
  • Lukichev V.G.
RU2200841C2
METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS 2013
  • Kosolapov Aleksandr Innokent'Evich
  • Ptashnik Aleksandr Igorevich
  • Ptashnik Julija Pavlovna
RU2515649C1
METHOD OF OPENCAST AND UNDERGROUND MINING OF ELONGATED TO STRIKE INCLINED STEEPLY DIPPING DEPOSITS OF HIGH THICKNESS 1998
  • Atrushkevich A.A.
  • Mikhal'Chenko V.V.
RU2143075C1
METHOD OF MINERAL OPENCAST MINING 0
  • Brekhov Ivan Tikhonovich
SU1730452A1
METHOD FOR COMBINED MINING OF FIELDS 2011
  • Mozer Sergej Petrovich
  • Matafonov Fedor Alekseevich
RU2471988C1
METHOD OF COMBINED MINING OF MINERAL DEPOSITS 0
  • Sekisov Artur Gennadievich
  • Bryukhovetskij Oleg Stepanovich
  • Yakovleva Tatyana Nikolaevna
  • Tomskikh Aleksandr Aleksandrovich
  • Vilyatitskij Boris Eduardovich
SU1714130A1
METHOD FOR OPEN-CUT MINING OF MINERAL DEPOSITS 2017
  • Semenov Aleksandr Sergeevich
  • Bazarova Ekaterina Ivanovna
  • Loktyukova Olga Yurevna
RU2642903C1

RU 2 137 921 C1

Authors

Akishev A.N.

Bakhtin V.A.

Gakhov A.Ja.

Dates

1999-09-20Published

1998-06-08Filed