FIELD: mining industry, opencast mining of deposits of mineral wealth. SUBSTANCE: process of development of steeply deeping deposits while working deep floors in stripping includes development of stripping in turns, fill of overburden rocks to external and internal dumps. Pillar of mineral product is left in lower part of stripping and internal dumps are filled with addition to left pillar and multiple transfer of overburden. Pillar of mineral product is developed at last stage of work. EFFECT: reduced labor input to overburden operation thanks to increase of internal dumps. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OF STEEPLY DIPPING DEPOSITS OF WORKING OF DEEP HORIZONS OF OPENCAST | 2001 |
|
RU2187648C1 |
METHOD OF COMBINED MINING OF MINERAL DEPOSITS IN OPENCAST CONTOUR ZONE | 2000 |
|
RU2187643C2 |
METHOD OF FORMATION OF OPENCAST NONMINING FLANK IN ARGILLACEOUS ROCKS | 2001 |
|
RU2208163C1 |
METHOD OF EXTRACTION OF BEYOND-CONTOUR MINERAL RESERVES UNDER OPENCAST BOTTOM AND IN ITS FLANKS | 2001 |
|
RU2186984C1 |
METHOD OF DUMPING ON INCLINED BASE | 2002 |
|
RU2211333C1 |
METHOD FOR CLOSELY LOCATED ORE BODIES CUTTING WITH SEPARATE PITS | 2005 |
|
RU2294433C1 |
METHOD FOR RECONSTRUCTION OF FLOODED OPEN PITS | 1992 |
|
RU2039269C1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
METHOD FOR OPEN-CUT MINING OF MINERAL DEPOSITS | 2017 |
|
RU2642903C1 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378512C1 |
Authors
Dates
2003-03-20—Published
2001-06-18—Filed