FIELD: oil recovery from large depth. SUBSTANCE: submersible pump 1 is mounted in pit 2. They are tight, possess equal strength pertaining to pressure and are interconnected. Pressure of pump 1 is converted by means of jet pump 5 into static head of oil packer 6 entering pit 2 where it is settled partially, degassed and fed to consumer 12. EFFECT: considerable reduction of power requirements without introducing additional power consuming devices. 4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRAULIC CYCLONE | 2009 |
|
RU2393926C1 |
INSTALLATION AND METHOD OF OPERATION OF OIL WELLS | 2018 |
|
RU2695194C1 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
METHOD AND DEVICE FOR FORMATION GEOMECHANICAL IMPACT | 2018 |
|
RU2680563C1 |
METHOD OF FORMATION GEOMECHANICAL IMPACT | 2018 |
|
RU2680158C1 |
WELL OPERATION INSTALLATION | 2013 |
|
RU2531228C1 |
UNIT FOR OPERATION OF WATER SUPPLY WELLS | 2013 |
|
RU2536521C1 |
MAGNETIC PROCESSING SYSTEM FOR OIL PRODUCTION | 2021 |
|
RU2781516C1 |
METHOD OF DIB HOLE PREPARATION FOR HYDRAULIC FRACTURING | 2016 |
|
RU2622961C1 |
METHOD OF APPLICATION OF ELECTRICAL CENTRIFUGAL PUMP WITH MULTIPHASE PUMP AND PACKER | 2015 |
|
RU2620667C1 |
Authors
Dates
1999-09-27—Published
1998-05-13—Filed