FIELD: oil and gas industry.
SUBSTANCE: group of inventions relates to the oil industry and can be applied to improve the efficiency of oil production from low-permeable reservoirs in the development of oil fields. This problem is solved by forming an area of secondary fracturing around the well bore by cyclically reducing and increasing the bottomhole pressure. Each cycle consists of the stages of creating the most technologically possible depression to the reservoir, maintaining at the bottom-hole pressure reached, blocking the well at the mouth for a period of 1–2 days, forcing the increase of the bottomhole pressure by pumping fluid into the reservoir until the technologically realizable maximum bottomhole pressure is reached, blocking the well at the mouth for 1–2 days. Water or water-based solution, for example, produced water, water from a water intake system from other horizons, water from external sources or prepared saline solution based on them, or degassed oil, or condensate, or diesel fuel is used as a fluid forcing agent. When well is inactive, the pressure dynamics in the well are recorded. Cycles are repeated until stable values of productivity or injectivity coefficients are achieved. After the exposure cycles are completed, the well is put into operation under design modes of production or injection. Simultaneously with the method proposed device for its implementation.
EFFECT: technical result is to increase the efficiency of oil production from low-permeable formations.
14 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION GEOMECHANICAL IMPACT | 2018 |
|
RU2680158C1 |
METHOD OF INCREASING PRODUCTIVITY OF DEVELOPMENT WELLS AND INJECTION CAPACITY OF INJECTION WELLS | 2016 |
|
RU2620099C1 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
PROCESS OF COMPLETION, EXAMINATION OF OPERATION OF WELLS | 2001 |
|
RU2202039C2 |
IMMERSED PUMP-EJECTOR SYSTEM FOR EXTRACTING OIL | 2005 |
|
RU2295631C1 |
RESERVOIR PRESSURE MAINTENANCE SYSTEM | 2024 |
|
RU2824811C1 |
METHOD FOR MECHANISED PUMP OPERATION OF WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2631517C1 |
PUMPING BLOCK FOR WELL OPERATION (VARIANTS) | 2004 |
|
RU2300668C2 |
OPERATING METHOD OF FLOODED GAS WELLS, AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2484239C2 |
ROD PUMPING UNIT FOR DOWNHOLE LOCAL WATER PUMPING | 2007 |
|
RU2354848C1 |
Authors
Dates
2019-02-22—Published
2018-04-05—Filed