FIELD: construction engineering. SUBSTANCE: this can be used in construction of gravel- and sand-filled piles, in construction of cast-in-place posts of any diameter for bridge building and civil engineering. Pile has framework, concrete body with fortified base. Head-piece is secured on pile base. Framework is provided with stiffening ring which is rigidly secured in upper part of framework. Fortified base is rigidly connected with framework. Head-piece is located inside fortified base. Application of aforesaid arrangement allows for reaching high load-bearing capacity of structure, improved water-impermeability and frost-resistance of pile concrete. It allows for increasing load-bearing capacity at pad and ensures mounting of reinforcement framework strictly along axis. EFFECT: higher efficiency. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PLANT FOR CONCRETING CAST-IN-PLACE PILES | 1998 |
|
RU2139978C1 |
METHOD FOR BUILDING CAST-IN-PLACE PILES AND FORTIFYING THEIR BASES | 1998 |
|
RU2139975C1 |
PROCESS OF PLACING CONCRETE INTO CAST-IN-PLACE PILES AND INSTALLATION FOR ITS IMPLEMENTATION | 1996 |
|
RU2097489C1 |
VIBRATION EXCITER FOR EQUIPMENT FOR PLACING CONCRETE INTO CAST-IN-PLACE PILES | 1996 |
|
RU2097490C1 |
JIG FOR EQUIPMENT PLACING CONCRETE INTO CAST-IN-PLACE PILES | 1996 |
|
RU2097491C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
EXTENDABLE SCREW PILE AND METHOD FOR ITS ARRANGEMENT | 2021 |
|
RU2769003C1 |
METHOD OF PILE PRODUCTION BY IMPRESSION | 2013 |
|
RU2554368C2 |
METHOD OF PRODUCING PILE BY IMPRESSION | 2015 |
|
RU2595102C1 |
SET PILE, ASSEMBLY METHOD OF COMPOSITE PILE AND IMMERSION METHOD THEREOF BY METHOD OF ROTARY DRILLING WITHOUT AXIAL LOAD ON UPPER END OF PILE | 2018 |
|
RU2709873C2 |
Authors
Dates
1999-10-20—Published
1998-12-28—Filed