FIELD: construction.
SUBSTANCE: method of pile production by impression involves well formation without ground excavation by impression of a pipe with an end cap diameter exceeding pipe diameter, and pipe filling with mortar. End cap is pointed and features a borescope with diameter exceeding pipe diameter, for formation of a gap between well wall and pipe body. The gap is filled with a mortar with hardening retarder through flexible hose connected to nozzle attached inside the borescope.
EFFECT: enhanced pile reliability, reduced construction period, simplified manufacturing technology.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCING PILE BY IMPRESSION | 2015 |
|
RU2595102C1 |
IMPRESSION PILE | 2023 |
|
RU2813841C1 |
METHOD FOR CONSTRUCTION OF INJECTION PILE | 2014 |
|
RU2550620C1 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD OF ARRANGING INJECTION PILE | 2016 |
|
RU2637002C1 |
INJECTION PILE AND THE METHOD FOR ITS INSTALLATION | 2021 |
|
RU2771363C1 |
METHOD FOR BORED INJECTION PILE ERECTION | 2003 |
|
RU2260093C2 |
METHOD OF INJECTION PILE BUILDING | 2003 |
|
RU2238366C1 |
ERECTION METHOD OF PILE FOUNDATION FOR REINFORCEMENT | 2015 |
|
RU2603314C1 |
METHOD OF ERECTION OF ARMCO PILE-INJECTOR | 2006 |
|
RU2332540C2 |
Authors
Dates
2015-06-27—Published
2013-10-09—Filed