FIELD: nuclear power plants. SUBSTANCE: existing power plant is provided, in addition, with steam-generating equipment which greatly improves its performance characteristics. For example, gas-turbine power generating system equipped with heat- recovery boiler KY-110 and high- and low-pressure microjet mixer-reheater is installed. Existing separator-reheater CP 50 may be simplified or dispensed with depending on power plant characteristics. All these measures make it possible to reduce primary-circuit temperature Thot without changing reactor power and to increase conversion cycle efficiency of power plant, to prolong its heat cycle, and to increase operating time of steam generator. Moreover, erosion and corrosion probability of secondary-circuit components including turbine blades and diaphragms is reduced. Gas-turbine generator used according to invention may also function to supply peak-power demands or stand-by power in case of accident. EFFECT: improved efficiency, safety, and service life, reduced refueling period of power plant. 24 cl, 24 dwg
Title | Year | Author | Number |
---|---|---|---|
COMBINED CYCLE POWER PLANT UNIT | 2023 |
|
RU2806955C1 |
METHOD OF IMPROVEMENT OF MANOEUVRABILITY OF ATOMIC POWER PLANTS | 2013 |
|
RU2529508C1 |
METHOD FOR OPERATION OF COMBINED CYCLE UNIT OF POWER PLANT | 2023 |
|
RU2806956C1 |
MODE OF EXPLOITING OF AN ATOMIC STEAM-TURBINE PLANT AND AN INSTALLATION FOR EXECUTING IT | 2003 |
|
RU2253917C2 |
COMBINATION-TYPE ELECTRIC POWER STATION WITH GAS AND STEAM TURBINES | 1999 |
|
RU2217615C2 |
POWER PLANT WITH COMBINED-CYCLE PLANT | 2012 |
|
RU2533601C2 |
METHOD OF OPERATING COMBINED-CYCLE POWER PLANT | 2015 |
|
RU2611138C1 |
METHOD TO INCREASE NPP CYCLIC LOAD CAPABILITY AND SAFETY | 2015 |
|
RU2604208C1 |
STEAM AND GAS ELECTRIC STATION | 1998 |
|
RU2134284C1 |
COMBINED GAS AND STEAM UNIT OF A POWER PLANT WITH PARALLEL OPERATION | 2020 |
|
RU2756880C1 |
Authors
Dates
1999-10-27—Published
1995-05-18—Filed