FIELD: gas production industry. SUBSTANCE: according to method, for installing cement bridge, lowered into well are pump-compressor pipes. Then, injected into well is calculated amount of cement slurry. Pump-compressor pipes are removed from cement slurry. Cement-slurry is subjected to curing until hardening up to 0.2-0.8 MPa. Pump-compressor pipes are used together with device intended for removing surplus size of cement bridge and up to resting against created cement bridge. Removal of surplus amount of cement bridge is effected by crushing of cement stone by injecting washing liquid at flow rate of 6-8 l/s and pressure of 45-50 atm. Application of aforesaid method allows for enhancing efficiency in creation of cement bridge. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INSTALLING CEMENT BRIDGING PLUG IN WELL WITH OPENED PERFORATION INTERVAL | 2002 |
|
RU2198998C1 |
METHOD FOR ISOLATION OF ABSORPTION ZONE IN WELLS | 1998 |
|
RU2139410C1 |
METHOD FOR CREATION OF GRAVEL FILTER IN WELL | 1999 |
|
RU2146759C1 |
METHOD OF INSTALLING A CEMENT PLUG FOR DRIVING UNSTABLE ROCKS WHEN DRILLING A WELL | 2019 |
|
RU2710577C1 |
METHOD FOR BLOCKING OF ABSORBING BEDS IN WELL | 1999 |
|
RU2144608C1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL | 2016 |
|
RU2644360C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
PROCEDURE FOR PLACEMENT OF CEMENT BRIDGING IN WELL | 2010 |
|
RU2435937C1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL UNDER INTAKE FORMATION | 2012 |
|
RU2503795C1 |
INSULATION METHOD FOR BEHIND-THE-CASING FLOWS IN PRODUCTION WELL | 2020 |
|
RU2739181C1 |
Authors
Dates
2000-03-20—Published
1999-04-21—Filed