FIELD: gas production industry, particularly, installation of isolating cement bridging plugs in wells with help of coltubing technique under conditions of tubing string shoe location above interval of waterflooding. SUBSTANCE: method provides for installation of cement bridging plug in well with opened perforation interval and includes running of long inserted-joint pipe into nonkilled well for injection and forcing of cement mortar without withdrawal of downhole equipment. Injection of the last 0.2-0.3 cu.m of cement mortar is carried out at rate of 2-3 l/s with simultaneous lifting of long inserted-joint pipe. Completion of cement mortar forcing from long inserted-joint pipe coincides with lift of long inserted-joint pipe up to upper elevation of cement bridging plug. EFFECT: higher efficiency of installation of isolating cement bridging plugs in well without its killing and withdrawal of downhole equipment.
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL | 2016 |
|
RU2644360C1 |
METHOD FOR CREATING CEMENT BRIDGE IN WELL | 1999 |
|
RU2146756C1 |
WELL REPAIR METHOD | 2004 |
|
RU2280754C1 |
PROCEDURE FOR TRIAL HOLE TESTING | 2008 |
|
RU2383732C1 |
METHOD FOR ISOLATION OF FORMATION WATER INFLOW IN WELL | 2005 |
|
RU2296209C1 |
WELL REPAIR METHOD | 2012 |
|
RU2498045C1 |
METHOD FOR WELL REPAIR | 2009 |
|
RU2398092C1 |
WELL BOTTOM ZONE TREATMENT METHOD | 2004 |
|
RU2261991C1 |
METHOD FOR WELL REPAIR | 2008 |
|
RU2354804C1 |
METHOD OF PERFORMING WATER-SHUTOFF OPERATIONS IN WELL | 2001 |
|
RU2188929C1 |
Authors
Dates
2003-02-20—Published
2002-01-21—Filed