METHOD FOR TREATMENT OF BOTTOM-HOLE ZONE OF WELL Russian patent published in 2000 - IPC

Abstract RU 2146761 C1

FIELD: oil production industry. SUBSTANCE: method can be used in intensification and insulation operations in wells. According to method, undertaken are interval injections of appropriate treating reagents into bottom-hole zone of well. Prior to injection of reagents, analyzed are geological characteristics of productive bed in well as to permeability of intervals. Found is width of interval with homogeneous geological properties. Assigned is width of interval as to permeability equal to 0.8 m. Reagents are successively injected into assigned intervals. At injection of reagents into adjacent intervals, reagent injection pressure is reduced for treatment. Application of aforesaid method improves efficiency of treating bottom-hole zone of well. EFFECT: higher efficiency.

Similar patents RU2146761C1

Title Year Author Number
METHOD FOR INTERVAL-AFTER-INTERVAL TREATMENT OF BOTTOM-HOLE ZONE OF HORIZONTAL WELLS 1998
  • Kudinov V.I.
  • Bogomol'Nyj E.I.
  • Suchkov B.M.
  • Kamenshchikov F.A.
RU2144616C1
METHOD FOR INTERVAL ACIDISING OF HORIZONTAL WELL USING CARBONATE RESERVOIR 2014
  • Makhmutov Il'Gizar Khasimovich
  • Musabirov Munavir Khadeevich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Abusalimov Ehduard Marsovich
RU2554962C1
METHOD FOR LEVELLING INJECTIVITY PROFILE WITH SIMULTANEOUS BACTERICIDAL TREATMENT 1998
  • Bogomol'Nyj E.I.
  • Nasyrov A.M.
  • Maljugin V.M.
  • Birjukov S.D.
  • Prosvirin A.A.
  • Ikonnikov V.V.
RU2142048C1
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL IN MULTIPLE-BED OIL DEPOSIT 1996
  • Bogomol'Nyj E.I.
  • Kamenshchikov F.A.
  • Borisov A.P.
  • Maljugin V.M.
  • Prosvirin A.A.
RU2092686C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL 2019
  • Khusainov Ruslan Fargatovich
  • Ismagilov Fanzat Zavdatovich
  • Tabashnikov Roman Alekseevich
RU2708747C1
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL IN MULTIPLE-BED OIL DEPOSIT 1996
  • Bogomol'Nyj E.I.
  • Nasyrov A.M.
  • Guljaev B.K.
  • Ivanov G.S.
  • Maljugin V.M.
  • Prosvirin A.A.
  • Borisov A.P.
RU2092685C1
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL IN MULTIPLE-BED OIL DEPOSIT 1996
  • Bogomol'Nyj E.I.
  • Nasyrov A.M.
  • Guljaev B.K.
  • Ivanov G.S.
  • Maljugin V.M.
  • Prosvirin A.A.
  • Borisov A.P.
RU2093668C1
PROCESSING OF FLOODED HORIZONTAL WELL WORKING OF CARBONATE FRACTURED POROUS RESERVOIR 2013
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sakhapova Al'Fija Kamilevna
  • Andreev Vladimir Aleksandrovich
RU2531985C1
METHOD FOR HORIZONTAL WELL BOTTOM ZONE INTERVAL TREATMENT 2007
  • Ibragimov Nail' Gabdulbarievich
  • Nugajbekov Ardinat Galievich
  • Afletonov Radik Abuzarovich
  • Isakov Vladimir Sergeevich
  • Torikova Ljubov' Ivanovna
  • Chupikova Izida Zangirovna
  • Merkulov Sergej Jur'Evich
  • Zajnutdinov Ildus Gedelzanovich
  • Sterljadev Jurij Rafailovich
RU2318999C1
METHOD OF OIL POOL DEVELOPMENT 1999
  • Khisamov R.S.
RU2149987C1

RU 2 146 761 C1

Authors

Bogomol'Nyj E.I.

Shmelev V.A.

Drachuk V.R.

Guljaev B.K.

Efremov V.F.

Ivanov G.S.

Prosvirin A.A.

Dates

2000-03-20Published

1999-08-09Filed