FIELD: chemistry.
SUBSTANCE: method for interval acidising of a horizontal well using a carbonate reservoir, which includes lowering a pipe string into a well; pumping acid compositions into the formation through the pipe string; conducting geophysical investigations in the horizontal well before treatment; selecting and separating intervals of the horizontal well into two groups; the first group includes intervals with permeability of 40-70 mD and water cut of the extracted product of 70-80%; the second group includes intervals with permeability of 5-39 mD and water cut of the extracted product of 50-69%; lowering into the horizontal well a pipe string plugged at the bottom and fitted with two packers with a perforated connecting pipe in between; performing consecutive treatment of the intervals of the horizontal well relating to the first group by sealed cut-off of each interval with subsequent alternating pumping into each interval in three cycles a temporary blocking composition at a rate of 6-12 m3/h, the temporary blocking composition used being a water-in-oil emulsion with dynamic viscosity of 120 mPa·s at 20°C, and an acid composition at a rate of 54-66 m3/h; after treatment of the intervals of the horizontal well relating to the first group, retrieving the pipe string from the horizontal well; at the mouth of the horizontal well, the pipe string is fitted with a liquid pulsator above the perforated connecting pipe and the pipe string which is plugged at the bottom and fitted with two packers with a perforated connecting pipe in between is once more lowered into the horizontal well; treating the intervals of the horizontal well of the second group by sealed cut-off of each interval with subsequent pulsed pumping into each interval a self-deviating acid composition based on a gelling agent at a rate of 24-36 m3/h.
EFFECT: intensifying oil extraction from a horizontal well, increasing oil yield and reducing the water cut of the extracted product.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESSING OF FLOODED HORIZONTAL WELL WORKING OF CARBONATE FRACTURED POROUS RESERVOIR | 2013 |
|
RU2531985C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL | 2019 |
|
RU2708747C1 |
METHOD FOR HYDRAULIC FRACTURING OF A FORMATION | 2020 |
|
RU2734892C1 |
METHOD OF OPENING AND DEVELOPMENT OF HETEROGENEOUS RESERVOIRS | 2019 |
|
RU2730064C1 |
DEVELOPMENT METHOD OF SUPER-VISCOUS OIL DEPOSIT WITH WATER-OIL ZONES | 2020 |
|
RU2730705C1 |
METHOD FOR SELECTIVE BOTTOMHOLE ZONE PROCESSING OF INHOMOGENEOUS STRATIFIED PRODUCTIVE FORMATION | 2014 |
|
RU2600800C2 |
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS | 2015 |
|
RU2597220C1 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS WITH WATER OIL ZONES | 2015 |
|
RU2578134C1 |
METHOD OF ACID TREATMENT OF OIL RESERVOIR | 2014 |
|
RU2551612C1 |
METHOD FOR HYDRAULIC FRACTURING OF A FORMATION ON A CARBONATE DEPOSIT OF HIGH-VISCOSITY OIL | 2022 |
|
RU2784709C1 |
Authors
Dates
2015-07-10—Published
2014-05-08—Filed