FIELD: oil production, particularly methods for stimulating production by forming crevices or fractures using eroding chemicals.
SUBSTANCE: method involves determining zones characterized by different oil saturation and permeability in horizontal uncased well bore; arranging flow string in cased vertical part of the well; locating extreme-line coiled tubing pipe inside flow string; arranging coiled tubing pipe end opposite to reservoir zone having minimal oil saturation and permeability; injecting acid solution in well through extreme-line coiled tubing pipe; lifting extreme-line coiled tubing pipe in cased well zone; forcing acid solution in reservoir through flow string; serially arranging extreme-line coiled tubing pipe end in reservoir zones characterized by increasing oil saturation and permeability; injecting acid solution in well through extreme-line coiled tubing pipe aligned with each zone; lifting extreme-line coiled tubing pipe in casing pie; forcing acid solution in reservoir through pipe string; performing time-delay and carrying out swabbing operation. Acid solution is forced at rate of 3-4 m3/hour under 1-3 MPa pressure at well head.
EFFECT: increased deliverability of well drilled in non-uniform reservoir.
1 ex
| Title | Year | Author | Number | 
|---|---|---|---|
| BOTTOMHOLE ZONE TREATMENT METHOD FOR HORIZONTAL WELL | 2013 | 
 | RU2527434C1 | 
| ACID TREATMENT OF AN OIL EXPLOITATION WELL BOTTOM-HOLE AREA | 2011 | 
 | RU2441979C1 | 
| METHOD OF HORIZONTAL WELL OPERATION | 2007 | 
 | RU2335621C1 | 
| METHOD OF INTERVAL-BY-INTERVAL TREATMENT OF PRODUCING FORMATION WITH OPEN HORIZONTAL BOREHOLE | 2014 | 
 | RU2570179C1 | 
| HORIZONTAL WELL OPERATION METHOD | 2014 | 
 | RU2558090C1 | 
| METHOD FOR DEVELOPMENT OF SUPERVISCOUS OIL FORMATION WITH ACID TREATMENT | 2024 | 
 | RU2834810C1 | 
| WELL BOTTOM ZONE TREATMENT PROCESS | 2006 | 
 | RU2304710C1 | 
| METHOD OF INTERVAL PRODUCTIVE FORMATION TREATMENT IN OPEN HORIZONTAL BORE OF WELL | 2016 | 
 | RU2618249C1 | 
| HORIZONTAL WELL COMPLETION METHOD | 2015 | 
 | RU2588108C1 | 
| METHOD FOR WELL COMPLETION | 2012 | 
 | RU2490442C1 | 
Authors
Dates
2008-03-10—Published
2007-03-01—Filed