FIELD: manufacture of jewelry articles. SUBSTANCE: method involves applying tape made from mentioned alloy and having thickness of 0.14-0.16 mm on base in the form of metal wire by simultaneously drawing it through row of forming sleeves having gradually decreasing diameter; forming produced tubular construction for obtaining jewelry article or part of jewelry article; removing metal wire by etching it. Drawing process is performed at the rate of 20-100 cm/min and pressing force of 10-40 kg until thickness of mentioned alloy reaches 0.05-0.1 mm. Aluminum wire may be used as base. It is etched in 20-70% aqueous alkali solution at temperature of 50-80 C. Method allows hermetically sealed thin-walled construction with guaranteed precious metal purity to be produced. EFFECT: increased efficiency and improved quality of jewelry articles. 2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MANUFACTURING JEWELRY AND JEWELRY MANUFACTURED THEREWITH | 2016 |
|
RU2667227C2 |
METHOD OF MANUFACTURE OF BIMETALLIC WIRE FROM PRECIOUS METALS | 2016 |
|
RU2626260C1 |
METHOD OF FASTENING INSERTS IN JEWELRY OR BIJOUTERIE ARTICLE | 1999 |
|
RU2150220C1 |
PRODUCTION OF BIMETAL PRECIOUS METAL ROLLED STOCK | 2014 |
|
RU2562191C1 |
PRODUCTION OF BIMETAL PRECIOUS METAL ROLLED STOCK | 2014 |
|
RU2562193C1 |
JEWELLERY LOCK | 2009 |
|
RU2396140C1 |
METHOD OF DYEING OBJECTS OF GOLD-BASED ALLOYS | 1997 |
|
RU2118993C1 |
METHOD OF MAKING MULTILAYER DECORATIVE CASE OF THE ARTICLE | 2014 |
|
RU2594768C2 |
INSULATING SCREENING SHELL | 2017 |
|
RU2662446C1 |
METHOD OF BIMETAL PIPE PRODUCING | 2015 |
|
RU2599947C1 |
Authors
Dates
2000-04-27—Published
1999-07-14—Filed