FIELD: oil-and-gas producing industry. SUBSTANCE: method includes delivery of hydrochloric acid in container of tubing on cable to required interval. Then lowered into well is gas generator with slowly burning charge, and the latter is ignited 0.1-1 m below the producing formation. Heated hydrochloric acid is forced into fractures and pores of formation. After time interval of 1-1.5 h implosive device is lowered into well for suction of reaction products from bottom-hole formation zone, and its subsequent removal to surface. EFFECT: higher efficiency of thermo-gas-chemical treatment of bottom-hole formation zone through the entire thickness of formation. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL TESTING AND CONTROL IN SWABBING PROCESS | 1999 |
|
RU2166077C2 |
PRODUCTIVE BOTTOMHOLE FORMATION ZONE TREATMENT METHOD | 2004 |
|
RU2271443C1 |
METHOD OF FLOW STRING CHECKING FOR TIGHTNESS | 1999 |
|
RU2165001C2 |
DEVICE FOR CLEANING WELL-ADJOINING ZONE IN PRODUCTIVE OIL BEDS | 1997 |
|
RU2123577C1 |
GEAR FOR THERMAL-GAS-ACIDIC TREATMENT OF PRODUCTIVE POOLS | 2000 |
|
RU2182656C2 |
METHOD FOR PROCESSING BOTTOM ZONE OF HORIZONTAL WELLS | 2004 |
|
RU2287680C2 |
METHOD FOR APPLYING THERMOGAS-DYNAMIC ACTION TO BED AND SOLID FUEL CHARGE FOR ABOVE METHOD IMPLEMENTATION | 2003 |
|
RU2261990C2 |
METHOD OF MULTICYCLE PULSE STIMULATION OF FORMATION WITH CLEANING OF BOTTOM-HOLE FORMATION ZONE | 1997 |
|
RU2136874C1 |
METHOD FOR THERMOCHEMICAL TREATMENT OF PRODUCTIVE BED | 2003 |
|
RU2233976C1 |
TREATMENT METHOD OF LAYER BOTTOMHOLE | 2007 |
|
RU2359113C1 |
Authors
Dates
2000-04-27—Published
1998-06-15—Filed