FIELD: oil production from wells. SUBSTANCE: installed in tubing at definite depth (700-1200 m) is funnel or spider. Lowered onto the latter before swabbing on logging cable is autonomous geophysical instrument recording pressure, temperature, electrical resistance and other parameters during the entire process of swabbing. Then logging cable is withdrawn and slip swab with weights is connected to logging cable and run to depth of 250-350 m. Then swab is lifted to the surface and fluid is withdrawn. Swabbing process is repeated until differential pressure on formation is reduced by 40-60%. Swab is removed from tubing and disconnected from logging cable. Connected to logging cable are catching devices and run into tubing for retrieval of autonomous instrument from well. Hydrodynamic parameters of formation are determined on basis of instrument readings. EFFECT: higher accuracy of determination of hydrodynamic characteristics of formation. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FLOW STRING CHECKING FOR TIGHTNESS | 1999 |
|
RU2165001C2 |
METHOD OF THERMO-GAS-CHEMICAL CLEANING OF BOTTOM-HOLE FORMATION ZONE | 1998 |
|
RU2148164C1 |
METHOD OF DEVELOPMENT OF WELLS AND TESTING OF FORMATIONS IN PROCESS OF SWABBING (VERSIONS) | 2007 |
|
RU2341653C1 |
WELL SWABBING METHOD | 2010 |
|
RU2410532C1 |
METHOD OF COMPLETING OIL OR GAS WELL AND DEVICE FOR ITS EMBODIMENT | 2000 |
|
RU2183730C2 |
METHOD OF COMPLETING OIL WELL AND DEVICE FOR ITS EMBODIMENT | 2000 |
|
RU2183731C2 |
DEVICE FOR WELL SWABBING | 1996 |
|
RU2121564C1 |
METHOD OF OIL WELL COMPLETION | 2000 |
|
RU2178063C2 |
OIL WELL SWABBING METHOD | 2004 |
|
RU2270912C1 |
METHOD OF WELL SWABBING | 2000 |
|
RU2181830C1 |
Authors
Dates
2001-04-27—Published
1999-04-05—Filed