FIELD: underground mining of solid minerals, preferably, low-strength ones; applicable in mining of thick coal seams. SUBSTANCE: method consists in drilling holes in deposit by auger drill with delivery of drilled out mineral to haulage drift. Drilling out is carried out at lower boundary of mined district of deposit. After drilling out of useful mineral, mineral mass overlaying the cavity formed by drilling-out is loosened, preferably by drilling and blasting without withdrawal of auger drill string. Output of loosened useful mineral from hole is accomplished by auger drill string up to appearance of cap rocks. EFFECT: extended field of application of auger drill mining and increased yield of graded useful mineral. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING OF INCLINED ORE BODIES | 1994 |
|
RU2069755C1 |
METHOD FOR MINING INCLINED ORE BODIES | 1996 |
|
RU2116448C1 |
METHOD OF SHAFT PILLAR TREATMENT | 2003 |
|
RU2235204C1 |
METHOD FOR MINING INCLINED ORE BODIES | 1994 |
|
RU2081319C1 |
METHOD FOR WORKING GENTLY-SLOPING THICK DEPOSITS WITH UNSTABLE ROCKS | 0 |
|
SU926294A1 |
PROCEDURE FOR DEVELOPMENT OF PACKED DUMP OF ANTHROPOGENIC MINERAL RAW MATERIAL | 2009 |
|
RU2394990C1 |
METHOD FOR DEVELOPMENT OF STEEP LAYERS BY SUBLEVEL HYDRAULIC BREAKAGE WITH ASSOCIATED OUTLET OF SHRUNK COAL FROM CHAMBERS OF UPPER STORY | 2008 |
|
RU2381364C1 |
METHOD FOR EXTRACTING LOW AND AVERAGE THICKNESS BEDS ACROSS THE RUN WITH ROCK LEFT IN MINE | 2005 |
|
RU2301333C2 |
METHOD FOR MINING ORE BODIES | 1994 |
|
RU2081320C1 |
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
Authors
Dates
2000-04-27—Published
1998-07-06—Filed