FIELD: mining industry. SUBSTANCE: method can be used for isolation of mine sections in carrying out emergency operations. Method implies installation of manifolds together with gaskets, anchors and fixing members, inlet and outlet pipe unions which are successively connected to source of working agent supply. Working agent is in the form of non-explosive crushing material. Body of isolating partition is formed, and non-explosive crushing material is delivered into manifolds for liquidation of isolating partition. Manifolds are made in the form of pipe coils installed at definite pitch inside shuttering. Inlet and outlet pipe unions are brought out to side of operating section of underground working. Application of aforesaid method allows for reducing labour intensity in depreservation or opening of fire section of mine. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CREATION AND LIQUIDATION OF ISOLATING PARTITION | 1998 |
|
RU2149264C1 |
PROCESS OF REINFORCEMENT OF ISOLATION AND OPENING OF SECTION ON FIRE | 1999 |
|
RU2151876C1 |
METHOD FOR PRODUCING ISOLATING PILLAR AND ITS ELIMINATION | 0 |
|
SU1680980A1 |
METHOD OF DRIVING IN CAVED ROCKS OF MINE WORKING | 2000 |
|
RU2181840C2 |
PROCESS OF ISOLATION OF FAULTY SECTION THROUGH HOLE FROM SURFACE | 2002 |
|
RU2223404C2 |
FORM FOR CONSTRUCTING AN EXPLOSION-PROOF PARTITION | 0 |
|
SU909210A1 |
UNVERSAL FORMS | 0 |
|
SU825989A1 |
EXPLOSION-RESISTANT ACTIVE PARTITION | 0 |
|
SU901565A1 |
FORMS | 0 |
|
SU956809A1 |
METHOD FOR ISOLATING AND EXTINGUISHING OF UNDERGROUND FIRES IN HARD-TO-REACH SITES OF MINE SHAFTS | 1997 |
|
RU2133830C1 |
Authors
Dates
2000-05-10—Published
1998-10-30—Filed