FIELD: mining industry; applicable in hydraulic borehole mining of minerals. SUBSTANCE: method includes drilling of vertical producing holes, their equipment with washing out, pulp-lifting devices and device for supporting of rocks of bed roof. Mining process is carried out by stages. Producing holes intersect orebody and are charged with explosives on section within bed interval. Charged explosives are blasted to form initial compensation chamber due to subsequent washing-out of rocks broken by blast. Volume of initially formed compensation chamber corresponds to volume of loosened rock mass from subsequent stage of mining and serves for accommodation of drilling equipment, equipment for hydraulic washing-out and roof support of worked bed. EFFECT: higher process and ecological efficiency of method application. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF DEVELOPMENT OF DEPOSITS OF SOLID MINERAL RESOURCES | 2000 |
|
RU2184233C2 |
METHOD FOR BREAKING ROCKS BY BLASTING AND DEVICE FOR ITS REALIZATION | 1992 |
|
RU2039253C1 |
METHOD OF EXECUTION OF BLASTING OPERATIONS | 1997 |
|
RU2116612C1 |
METHOD FOR TRETMENT OF HIGH SHELVES | 2003 |
|
RU2236588C1 |
WAY FOR WELL HYDROMINING WITH MAINTENANCE OF WORKING SEAM ROOF | 0 |
|
SU1830414A1 |
METHOD FOR EXTRACTING HARD MINERAL RESOURCES DEPOSITS | 2002 |
|
RU2236592C2 |
PROCESS OF BOREHOLE HYDRAULICKING OF MINERALS AND AGGREGATE FOR ITS IMPLEMENTATION | 1997 |
|
RU2109949C1 |
SELF-PROPELLED MOUNTING FOR LOCALIZATION OF BURST | 2000 |
|
RU2163347C1 |
METHOD OF DRIVING RAISES | 2016 |
|
RU2638992C2 |
MOBILE EXPLOSION LOCALIZER | 2003 |
|
RU2229097C1 |
Authors
Dates
2000-05-27—Published
1998-11-06—Filed