FIELD: oil and gas production. SUBSTANCE: method consists in injecting excess activated sludge followed by, 3 to 12 months later, injecting aqueous solutions of mixtures of dihydroxybenzenes, 2-4%, ratio of injected volumes being 1: (0.3-0.7). Water level in produced oil from some wells was 4-fold reduced during 10 months or longer. EFFECT: increased productivity of wells. 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OIL FIELD DEVELOPMENT | 2005 |
|
RU2302521C1 |
OIL FIELD DEVELOPMENT METHOD | 2005 |
|
RU2274739C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2000 |
|
RU2178069C1 |
OIL DEPOSIT EXTRACTION METHOD | 2002 |
|
RU2224880C1 |
PROCESS OF CONTROL OVER PENETRABILITY OF INHOMOGENEOUS POOL | 2000 |
|
RU2182654C1 |
METHOD OF DEVELOPMENT OF OIL FIELD | 1997 |
|
RU2143549C1 |
COMPOSITION FOR INTENSIFICATION OF OIL RECOVERY | 2001 |
|
RU2188935C1 |
METHOD FOR DEVELOPMENT OF OIL POOLS | 1996 |
|
RU2099512C1 |
METHOD FOR DEVELOPMENT OF FLOODED OIL DEPOSIT NON-UNIFORM IN GEOLOGICAL STRUCTURE | 1997 |
|
RU2115801C1 |
METHOD OF CONTROLLING OIL DEPOSIT DEVELOPMENT BY WATERFLOODING | 1999 |
|
RU2162143C1 |
Authors
Dates
2000-06-10—Published
1999-03-11—Filed