FIELD: oil and gas production. SUBSTANCE: installation consists of production string mounted in well with cylinder and piston to generate within well space wave pressure pulses in the moments piston comes out of cylinder. Installation is also provided with pipeline to withdraw gas from production string. Lower end of cylinder is opened into well space, while piston has dead ends. Production string further has side holes with back valves to pass fluid from well space into production string space when piston moves down. EFFECT: reduced loss of power in transferring pulses into productive formation. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TREATING DEPOSIT BY WAVES | 1997 |
|
RU2139405C1 |
PLANT FOR PULSE STIMULATION OF POOL | 1997 |
|
RU2140533C1 |
DEVICE FOR OIL PRODUCTION AND WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2307925C1 |
DEEP-WELL SUCKER-ROD PUMPING UNIT | 2001 |
|
RU2205979C1 |
METHOD OF DEVELOPMENT OF FORMATION WITH DIFFICULT TO RECOVER OIL RESERVES | 2002 |
|
RU2213210C1 |
SUCKER-ROD PUMPING UNIT FOR OIL PRODUCTION FROM WELLS WITH PRESENCE OF SUMP IN CONDITIONS OF HIGH GAS FACTOR | 2024 |
|
RU2825379C1 |
DEVICE FOR OIL PRODUCTION AND WELL BOTTOM TREATMENT | 2005 |
|
RU2296214C1 |
METHOD OF SYNERGISTIC ACTION ON WELL AND PRODUCTIVE POOL AND GEAR FOR SYNERGISTIC ACTION ON WELL AND PRODUCTIVE POOL | 2000 |
|
RU2176727C1 |
DEVICE TO APPLY REPEATED HYDROIMPULSIVE ACTION TO BOTTOMHOLE FORMATION ZONE | 2004 |
|
RU2299306C2 |
METHOD OF STIMULATION OF HYDROCARBON POOL IN ITS DEVELOPMENT AND DEVICE FOR METHOD EMBODIMENT | 2002 |
|
RU2209945C1 |
Authors
Dates
2000-06-20—Published
1997-12-25—Filed