FIELD: nuclear power engineering. SUBSTANCE: fuel assembly has head 1 and shank 2 interconnected through guide channels 3 as well as metering channel 4 and absorbing rods 5 placed in guide channels and suspended from brackets 6 of respective movable yoke 7. Guide channels 3 and metering channel 4 are arranged among fuel elements 8 vertically mounted in spacer grids 9. Metering channel 4 has entrance 10 on top to pass metering probe 11; it is arranged between projections of brackets 6 on yoke 7 for absorbing rods 5 onto cross-sectional area of fuel assembly. Metering probe provides for reliable monitoring of coolant conditions and neutron flux density in reactor core. EFFECT: improved safety of reactor. 2 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| NUCLEAR REACTOR FUEL ASSEMBLY | 2015 | 
 | RU2583842C1 | 
| FUEL ASSEMBLY OF NUCLEAR REACTOR | 2010 | 
 | RU2419899C1 | 
| NUCLEAR REACTOR FUEL ASSEMBLY | 1999 | 
 | RU2190263C2 | 
| NUCLEAR-REACTOR FUEL ASSEMBLY | 1999 | 
 | RU2178923C2 | 
| FUEL ASSEMBLY AND CORE OF WATER-COOLED NUCLEAR REACTOR | 2001 | 
 | RU2216056C2 | 
| FUEL ASSEMBLY OF WATER-MODERATED WATER-COOLED POWER REACTOR | 2003 | 
 | RU2255384C2 | 
| REMOVABLE TOP NOZZLE OF NUCLEAR REACTOR (ALTERNATIVES) | 2001 | 
 | RU2221289C2 | 
| LINE FOR ASSEMBLING FUEL ELEMENTS TO FUEL ASSEMBLIES | 2000 | 
 | RU2193959C2 | 
| REMOVABLE TOP NOZZLE OF NUCLEAR-REACTOR FUEL ASSEMBLY (ALTERNATIVES) | 2001 | 
 | RU2212065C2 | 
| NUCLEAR REACTOR FUEL ASSEMBLY | 2006 | 
 | RU2319233C2 | 
Authors
Dates
2000-06-27—Published
1998-03-12—Filed