FIELD: nuclear power engineering. SUBSTANCE: fuel assembly has head 1 and shank 2 interconnected through guide channels 3 as well as metering channel 4 and absorbing rods 5 placed in guide channels and suspended from brackets 6 of respective movable yoke 7. Guide channels 3 and metering channel 4 are arranged among fuel elements 8 vertically mounted in spacer grids 9. Metering channel 4 has entrance 10 on top to pass metering probe 11; it is arranged between projections of brackets 6 on yoke 7 for absorbing rods 5 onto cross-sectional area of fuel assembly. Metering probe provides for reliable monitoring of coolant conditions and neutron flux density in reactor core. EFFECT: improved safety of reactor. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
NUCLEAR REACTOR FUEL ASSEMBLY | 2015 |
|
RU2583842C1 |
FUEL ASSEMBLY OF NUCLEAR REACTOR | 2010 |
|
RU2419899C1 |
NUCLEAR REACTOR FUEL ASSEMBLY | 1999 |
|
RU2190263C2 |
NUCLEAR-REACTOR FUEL ASSEMBLY | 1999 |
|
RU2178923C2 |
FUEL ASSEMBLY AND CORE OF WATER-COOLED NUCLEAR REACTOR | 2001 |
|
RU2216056C2 |
FUEL ASSEMBLY OF WATER-MODERATED WATER-COOLED POWER REACTOR | 2003 |
|
RU2255384C2 |
REMOVABLE TOP NOZZLE OF NUCLEAR REACTOR (ALTERNATIVES) | 2001 |
|
RU2221289C2 |
LINE FOR ASSEMBLING FUEL ELEMENTS TO FUEL ASSEMBLIES | 2000 |
|
RU2193959C2 |
REMOVABLE TOP NOZZLE OF NUCLEAR-REACTOR FUEL ASSEMBLY (ALTERNATIVES) | 2001 |
|
RU2212065C2 |
NUCLEAR REACTOR FUEL ASSEMBLY | 2006 |
|
RU2319233C2 |
Authors
Dates
2000-06-27—Published
1998-03-12—Filed