FIELD: oil-and-gas producing industry. SUBSTANCE: method is used in performance of repair and sealing operations in wells, particularly, in recovery of tightness of tubing-casing annular spaces in operation of deep oil, gas and gas-condensate wells. Method includes heating of casing string and tubing-casing annular space; injecting into annular space of sealing composition; cooling of casing string and annular space. Casing string and annular space is cooled prior to injection of sealing composition. For this purpose, well is shutoff. Casing string and annular space are heated after injection of sealing composition and well is brought into operation. Sealing composition is used in the form of polymer grouting material with solidification within temperature range of 65-100 C. EFFECT: higher sealing of annular space due to increased interval of filling of overflow channels with sealing composition and formation of channel of long-tern impermeable composition. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXPRESS-REPAIRS TO RESTORE PRESSURIZATION OF GAS-WATER-OIL SHOWING WELLS | 2005 |
|
RU2287663C2 |
METHOD OF EXPRESS-REPAIR FOR RESTORATION OF TIGHTNESS OF GAS-WATER-OIL SHOWINGS OF WELLS | 2008 |
|
RU2364702C1 |
METHOD FOR ELIMINATION OF GAS CROSS-FLOWS BETWEEN STRINGS | 1990 |
|
RU2017935C1 |
METHOD OF EXPRESS REPAIR TO RECOVER TIGHTNESS OF GAS-WATER-OIL EXPOSING WELLS | 2010 |
|
RU2447257C2 |
METHOD FOR PREVENTING OCCURRENCE OF INTER-CASING AND INTER-LAYER FLOWS IN WELL | 2023 |
|
RU2808074C1 |
METHOD FOR ELIMINATION OF FLUID CROSSFLOWS IN A WELL | 2018 |
|
RU2702455C1 |
METHOD OF SEALING OF GAS WELL LINING | 2001 |
|
RU2213203C2 |
PROCEDURE FOR CASING CEMENTING AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2513581C2 |
METHOD OF ISOLATION OF PRODUCING FORMATION OVERLAPPED BY FLOW STRING | 1998 |
|
RU2154150C2 |
METHOD FOR PREPARING WELL TO LOWERING AND CEMENTATION OF CASING STRING | 1998 |
|
RU2144609C1 |
Authors
Dates
2000-07-27—Published
1998-09-14—Filed