FIELD: oil-and-gas industry. SUBSTANCE: method is used in well abandonment on deposits whose hydrocarbon material contains high percentage of aggressive components. The method includes installation of cement bridging plugs. One cement bridging plug is installed in cap rock of well producing formation. Preliminarily, wellbore is freed from flow string and cement ring by milling within interval of installation of cement bridging plug. Cement ring is drilled and wellbore is expanded for 10-15 mm from initial size. EFFECT: higher reliability of producing formation isolation. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHODS OF ISOLATION OF THE PRODUCTIVE STRATA OVERLAPPED BY THE CASING STRINGS AND THE GROUTING MORTAR FOR ITS EXERCISE | 2005 |
|
RU2299230C2 |
WELL KILLING METHOD | 2004 |
|
RU2283942C2 |
METHOD AND DEVICE FOR FLUID-CONTAINING RESERVOIR ISOLATION | 2005 |
|
RU2312972C2 |
ABANDONMENT METHOD FOR WELL WITH GAS SHOW IN TUBING-CASING ANNULUS | 2005 |
|
RU2305754C2 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
METHOD OF TIGHTNESS RECOVERY OF WELL TUBING-CASING ANNULAR SPACE | 1998 |
|
RU2153571C2 |
GAS WELL CONSERVATION METHOD | 2005 |
|
RU2301880C2 |
METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 |
|
RU2576422C1 |
METHOD FOR ELIMINATION OF FLUID CROSSFLOWS IN A WELL | 2018 |
|
RU2702455C1 |
METHOD OF WELL ABANDONMENT | 2012 |
|
RU2499127C1 |
Authors
Dates
2000-08-10—Published
1998-06-15—Filed