FIELD: mining industry; applicable, particularly, in gold recovery from gold-containing ores. SUBSTANCE: complex includes the following components arranged along process route and interconnected by transportation facilities: crushing module, grinding module and module of centrifugal concentration made of centrifugal apparatuses of main and check concentration. Complex is provided with, at least, one short conical hydrocyclone. Centrifugal apparatuses of main concentration are communicated correspondingly; one apparatus is connected with sand branch pipe, and the other apparatus is connected through main concentration hydrocyclone with discharge branch pipe of short conical hydrocyclone. Centrifugal apparatus of check concentration has device for withdrawal of tailings of main concentration centrifugal apparatuses through check concentration hydrocyclone and battery of check concentration hydrocyclones. Sand branch pipe of check concentration hydrocyclone is communicated with mill of grinding module. EFFECT: provided stability of complex operation. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPLEX FOR PROCESSING OF GOLD-BEARING ORES | 1998 |
|
RU2137550C1 |
COMPLEX OF GOLD-CONTAINING ORES PROCESSING | 1998 |
|
RU2149695C1 |
COMPLEX FOR PROCESSING GOLD ORE DEPOSITS OF SHALE FORMATION OF STRINGER-PORPHYRY MINERALISATION TYPE | 2013 |
|
RU2542924C2 |
COMPLEX FOR PROCESSING GOLD-CONTAINING ORES | 1997 |
|
RU2123891C1 |
MOBILE ORE CONCENTRATING MODULE COMPLEX | 2000 |
|
RU2185889C2 |
ORE BENEFICATION MOBILE MODULAR COMPLEX | 2004 |
|
RU2281809C2 |
FLOW LINE FOR ENRICHMENT OF POLYMETALLIC RAW MATERIAL AND ISOLATION OF FINISHED PRODUCT | 2016 |
|
RU2634314C1 |
CONCENTRATION MODULE | 2002 |
|
RU2211731C1 |
METHOD OF CONCENTRATION OF GOLD-CONTAINING ORE | 2002 |
|
RU2211730C1 |
METHOD FOR GOLD EXTRACTION FROM ORES | 2006 |
|
RU2318887C1 |
Authors
Dates
2000-09-10—Published
1998-12-11—Filed