FIELD: oil producing industry, particularly, well workover. SUBSTANCE: method includes determination of water inflow profile and injection of isolating material; cutting out of flow string part corresponding to thickness of producing formation; simultaneous cutting out of cement stone; installation of cement bridge above lower end of cutout part of flow string above floor of producing formation. According to the second version, one part of flow string is cutout from floor and above roof of producing formation for height of at least, 5 m. Cement stone is cutout simultaneously. Rundown into flow string is pipe of smaller diameter. Space between strings is cemented and string of lower diameter is perforated in oil-bearing part of formation. EFFECT: higher reliability of isolation. 2 cl
Title | Year | Author | Number |
---|---|---|---|
ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER | 2015 |
|
RU2584256C1 |
DEVICE FOR FORMATIONS SEGREGATION | 2000 |
|
RU2182958C2 |
METHOD OF HORIZONTAL WELL COMPLETION | 2000 |
|
RU2171359C1 |
METHOD OF OIL POOL DEVELOPMENT AT LATE STAGE | 2000 |
|
RU2178517C2 |
METHOD OF INCREASING OIL WELL PRODUCTIVITY | 1999 |
|
RU2177535C2 |
METHOD OF RECOVERY OF FLOODED GAS WELL WITH COLLAPSED PRODUCTION TUBING IN PRODUCTIVE INTERVAL | 2011 |
|
RU2465434C1 |
METHOD OF OIL WELL DEVELOPMENT (VERSIONS) | 2014 |
|
RU2558069C1 |
METHOD OF FORMATION ISOLATION | 2001 |
|
RU2187622C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES | 2021 |
|
RU2774251C1 |
METHOD OF SEGREGATION OF FORMATIONS IN WELL | 1999 |
|
RU2183265C2 |
Authors
Dates
2000-09-10—Published
1999-01-18—Filed