FIELD: methods of treatment of bottom-hole formation zones for restriction of water inflow and higher oil recovery. SUBSTANCE: method includes isolation of water-encroached interlayers in zone of perforation by injection of isolation compositions into producing formation, setting up of cement bridge, drilling of cement bridge, repeated tapping of isolated interlayers. Measurement of producing formation temperature is carried out before and after injection into formation of isolation composition. Repeatedly tapped are those isolated producing interlayers whose temperature remains unchanged or changed slightly. EFFECT: higher reliability of isolation of water-encroached interlayers due to exclusion of their tapping by perforation. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL POOLS | 1996 |
|
RU2099512C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2114286C1 |
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2011 |
|
RU2471062C1 |
METHOD OF LOST CIRCULATION CONTROL IN WELL REPAIR AND ISOLATION OPERATIONS (VERSIONS) | 1999 |
|
RU2155858C1 |
METHOD FOR EXTRACTING MULTIBED DEPOSIT AT LATER STAGE | 2003 |
|
RU2236566C1 |
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2012 |
|
RU2488692C1 |
TECHNIQUE TO DEVELOP OIL FIELD AT LATEST STAGE | 2002 |
|
RU2223392C1 |
METHOD OF OIL WELL DEVELOPMENT (VERSIONS) | 2014 |
|
RU2558069C1 |
METHOD OF PRODUCTIVE RESERVOIR OPENING | 2018 |
|
RU2723813C2 |
METHOD FOR ISOLATING WATER INFLOWS IN GAS WELLS WITH A SUB-HORIZONTAL WELLBORE END | 2022 |
|
RU2794105C1 |
Authors
Dates
2001-12-27—Published
1999-12-03—Filed