FIELD: railway transport; water supply systems. SUBSTANCE: proposed device has communicating water filling pipe 3, valve gear and tank filling control device including tube 9 communicating with overflow pipe 8. Tube 9 is provided with hole 18. EFFECT: provision of required water level in tank irrespective of pressure of water supplied by main line. 6 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR PRIMING TANK WITH WATER | 1996 |
|
RU2117595C1 |
DEVICE FOR FILLING TANK WITH WATER (VERSIONS) | 1998 |
|
RU2139213C1 |
FILLING STATION; SELECTOR SWITCH | 2002 |
|
RU2212351C1 |
WATER DISPENSING COLUMN | 2001 |
|
RU2182094C1 |
STOP VALVE OF WATER SUPPLY SYSTEM | 2007 |
|
RU2344955C1 |
LOCKING ARM OF WATER SUPPLY SYSTEM IN PASSANGER CARRIAGE | 2007 |
|
RU2328394C1 |
WATER SUPPLY SYSTEM SHUT-OFF DEVICE | 2008 |
|
RU2376179C2 |
METHOD OF AND SYSTEM FOR AUTOMATIC FILLING OF WATER AND DISPENSING COLUMN FOR IMPLEMENTING THIS METHOD | 2000 |
|
RU2162040C1 |
WATER SUPPLY SYSTEM SHUTOFF DEVICE | 2008 |
|
RU2379208C2 |
RAILWAY PASSENGER CAR WATER SUPPLY SYSTEM | 2012 |
|
RU2501688C1 |
Authors
Dates
2000-09-27—Published
1999-09-27—Filed