FIELD: ferrous metallurgy, namely apparatuses for loading skips of shaft furnaces. SUBSTANCE: hopper platform includes weighing funnel with gate jointly secured to it by means of axles. Skips for feeding loose material to furnace are arranged at side of discharging weighing funnel. Stoppers are secured to weighing funnel. Gate is mounted with gap relative to end face of weighing funnel. Relation values of said gap and distance between skip axles to distance between central axes of skips consist respectively 0.03-0.05 and 0.15-0.25. EFFECT: enhanced quality of charging blast furnace due to reduced crushing of charged material. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
LOADING RAMP OF BLAST FURNACE HOPPER | 1996 |
|
RU2092566C1 |
INSTALLATION FOR CHARGING SKIP OF BLAST FURNACE | 1995 |
|
RU2084538C1 |
BLAST FURNACE CHARGING METHOD | 1996 |
|
RU2096479C1 |
BIN TRESTLE OF BLAST FURNACE | 1997 |
|
RU2121508C1 |
METHOD OF PRODUCING PIG IRON WITH USE OF BLAST-FURNACE PROCESS AT METALLURGICAL ENTERPRISE | 1998 |
|
RU2131929C1 |
METHOD FOR CONTROLLING BLAST FURNACE OPERATION | 1999 |
|
RU2167202C1 |
METHOD FOR PRODUCTION OF CAST IRON AND STEEL UTILIZING BLAST-FURNACE AND STEEL-SMELTING EQUIPMENT ON METALLURGICAL ENTERPRISE | 1998 |
|
RU2137844C1 |
BLAST FURNACE CHARGING METHOD | 1995 |
|
RU2095420C1 |
BLAST-FURNACE METHOD | 2000 |
|
RU2184152C1 |
BLAST SMELTING CONTROL SYSTEM | 2001 |
|
RU2199590C1 |
Authors
Dates
2000-11-10—Published
1999-09-14—Filed