FIELD: ferrous metallurgy. SUBSTANCE: method involves charging waste lining of blast furnace casting yard chutes containing at least 50% of carbon into furnace comprising burden ore portion, with lining being charged into furnace ore storage bins after collecting half the ore charge; conveying waste material by conveyor into charging ladle or to conveyor for feeding burden onto furnace mouth. Weight W(l) of lining to be fed is determined as ratio of W(l) of daily delivery charge of lining into ore storage bins to number of charges C supplied into furnace per day, and weight C1 of coke per one charge is determined on the basis of expression C1=W(l)C1 = W(1)•C1/Cc Cl/Cc, where C is weight of coke per one charge before initial charging of lining into furnace; Cl, Cc is content of carbon in lining and coke, respectively. Method is used for steel smelting in blast furnace. EFFECT: increased efficiency and reduced hazardous effect of blast furnace steel smelting upon environment. 3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONTROLLING BLAST FURNACE OPERATION | 1999 |
|
RU2167202C1 |
BLAST FURNACE CHARGING METHOD | 1995 |
|
RU2095420C1 |
METHOD OF FLUSHING OF BLAST-FURNACE HEARTH | 1998 |
|
RU2136761C1 |
METHOD OF BLAST-FURNACE BLOWING-IN | 1999 |
|
RU2164242C2 |
METHOD FOR BLOWING-IN OF BLAST FURNACE | 2002 |
|
RU2235788C2 |
METHOD OF TITANIUM-MAGNETITE RAW MATERIALS BLAST FURNACE HEATING | 1993 |
|
RU2063443C1 |
METHOD OF BLAST-FURNACE SMELTING | 2007 |
|
RU2342440C1 |
METHOD OF FORMING PROTECTIVE SLAG LINING IN BLAST FURNACE | 2004 |
|
RU2255114C1 |
METHOD OF WASHING BLAST FURNACE HEARTH | 1997 |
|
RU2119958C1 |
METHOD OF BLAST-FURNACE SMELTING | 2005 |
|
RU2283872C1 |
Authors
Dates
2002-06-27—Published
2000-12-14—Filed