FIELD: land reclamation. SUBSTANCE: drainage system has collector, blind drains, inspection well, mouth structure, temporary open network consisting of furrows combined with open temporary drain connected with intake well. System has mole drains arranged in plan and in vertical plane along furrow line. Slots of mole drain are made both at upper and lower sides. Mole drains are mated with sand filling through lower slot. EFFECT: improved water-air control in root-habitant layer of heavy textured mineral soils by accelerated removal of surface and ground water. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ARRANGING DRAINAGE-HUMIDIFICATION SYSTEM UNDER CONDITIONS OF USING WATERING BY SPRINKLING INSTALLATION WITH LIVESTOCK SEWAGE | 2016 |
|
RU2618091C1 |
DRAINAGE SYSTEM | 0 |
|
SU1656062A1 |
TWO-TIER DEHUMIDIFICATION AND HUMIDIFICATION SYSTEM | 2022 |
|
RU2789866C1 |
CONSTRUCTION METHOD OF DRYING SYSTEM | 2019 |
|
RU2725468C1 |
LAND RECLAMATION SYSTEM | 0 |
|
SU1818409A1 |
PROCESS OF CONSTRUCTION OF DRAINAGE SYSTEM | 2000 |
|
RU2195530C2 |
METHOD FOR RECONSTRUCTION OF DRAIN OF DRAINAGE NETWORK | 2022 |
|
RU2786538C1 |
SEEPAGE PIT | 0 |
|
SU1794985A1 |
DRAINAGE SYSTEM OPERATION CONTROL METHOD | 2001 |
|
RU2199625C1 |
IRRIGATION SYSTEM | 1998 |
|
RU2163067C2 |
Authors
Dates
2000-11-20—Published
1999-04-05—Filed