FIELD: construction.
SUBSTANCE: method involves formation of bordering dams on a land allotment intended for a tailing dump. This land allotment for a tailing dump is divided into plots whose service life ranges from one to two years. The plots are brought into service in turn one by one. While the third plot is diked, the second one is used and the first one undergoes restoration after 2-4 years after commencement of operation of the tailing dump. The first plot is filled by means of putting and ramming of a clay layer of 0.7-1 m thick as well as a fertile soil layer on the dam slopes for a biological recultivation.
EFFECT: reduced hydrodynamic load on the bordering dams and reduction in land loss as well as restoration of a tailing dump in the course of filling.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SET OF MECHANICAL AND HYDRAULIC RECULTIVATION OF DISTURBED LANDS | 2014 |
|
RU2569145C1 |
METHOD OF ACCELERATED MECHANOHYDRAULIC RECULTIVATION OF MINED SPACE OF OPEN MINE WORKINGS | 2020 |
|
RU2737300C1 |
METHOD FOR RECLAMATION OF OPEN MINES | 2005 |
|
RU2297533C1 |
DEVICE FOR DUMP AND REGULATION OF WITHDRAWAL DEPTH FROM HOLDING BASIN | 2006 |
|
RU2334047C2 |
CHUTE FOR GRAVITY PIPELINE TRANSPORT | 2010 |
|
RU2446285C2 |
MATERIALS DEHYDRATOR | 2010 |
|
RU2447946C2 |
COMPOUND DEVELOPMENT METHOD OF SERIES OF GENTLY SLOPING BEDS OF MINE FIELDS | 2009 |
|
RU2418168C1 |
METHOD OF MECHANICAL AND HYDRAULIC RECULTIVATION OF LANDS | 2014 |
|
RU2569146C1 |
METHOD FOR WASTEWATER SILT AND SLURRING BRIQUETTING | 2008 |
|
RU2410337C2 |
COMPLEX DEVELOPMENT METHOD OF BED SERIES OF ANTICLINE DEPOSITS | 2009 |
|
RU2425216C1 |
Authors
Dates
2008-10-10—Published
2006-10-31—Filed