FIELD: oil and gas industry. SUBSTANCE: invention can be used specifically to raise pressure of natural and side gases under field conditions when preparing them for transportation or when pumping them into gas-condensate deposits with use of cycling process, to compress gas or air while wells are exploited. Process includes sinking of two-row lift. Its internal pipe id lowered below external pipe. Gas and fluid mixture is taken into interpipe clearance with rate higher than that of floating up of bubbles of gas in fluid with provision for its separation in bottom part, gas is sampled into hole clearance of external pipe and fluid is taken into internal pipe. Prior to sinking lift along internal lift string well pump is installed, lowered to calculated depth and set in operation after supply of gas and fluid mixture into intertubular clearance. Gas line of hole clearance of external pipe is adjusted to pressure at which level of fluid in shaft of well after separation of gas should stay in interval between shoes of lift strings. EFFECT: expanded application field and enhanced degree of compression of gas. 1 cl
Title | Year | Author | Number |
---|---|---|---|
WELL EXCAVATOR PLUNGER | 1998 |
|
RU2149983C1 |
METHOD OF SAMPLING OF GAS THROUGH WELL | 0 |
|
SU1789669A1 |
DEVICE FOR OIL PRODUCTION WITH DOWNHOLE SEPARATION | 2014 |
|
RU2575856C2 |
METHOD FOR CREATION OF GRAVEL FILTER IN WELL | 1999 |
|
RU2146759C1 |
METHOD OF PREPARATION OF HYDROCARBON GAS FOR TRANSPORTATION | 1999 |
|
RU2171132C2 |
METHOD TO ACT ON WELL CRITICAL ZONE | 1992 |
|
RU2068494C1 |
METHOD FOR CREATING CEMENT BRIDGE IN WELL | 1999 |
|
RU2146756C1 |
METHOD OF GARIPOV FOR OIL PRODUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2405918C1 |
OIL WITH HIGH GAS CONTENT PRODUCTION METHOD FROM WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2667182C1 |
DEVICE FOR OIL RECOVERY | 1996 |
|
RU2144979C1 |
Authors
Dates
2001-02-27—Published
1999-06-25—Filed