FIELD: well drilling. SUBSTANCE: method consists in injecting lining fluid containing coagulation reagent (latex) and coagulating ion source (1.0-2.5% sodium chloride solution) at ratio 1:(0.5-3.5) and feeding fresh water into well before and after injection of lining fluid. Method is suitable for oil and gas wells. EFFECT: preserved high penetration capacity of lining solution during long time and enabled formation of strong coagulum in pores space of bed in bore zone of well. 6 tbl
Title | Year | Author | Number |
---|---|---|---|
HYDROGEL MUD AND METHOD OF ITS PRODUCING | 2000 |
|
RU2182586C2 |
METHOD OF SEALING OF GAS WELL LINING | 2001 |
|
RU2213203C2 |
COMPOSITION FOR SHUTOFF OF WATER INFLOWS TO WELL | 2001 |
|
RU2205269C2 |
DRILLING MUD | 1996 |
|
RU2119520C1 |
METHOD OF PREPARING LIGHT-WEIGHT GROUTING MORTAR | 2000 |
|
RU2172812C2 |
METHOD OF REINFORCEMENT OF LINING OF GAS WELLS | 1998 |
|
RU2166613C2 |
EMULSION FLUID | 2000 |
|
RU2196164C2 |
OIL-WELL FOAM CEMENT COMPOSITION | 2000 |
|
RU2176308C2 |
METHOD FOR PREVENTION OF DRILLING EQUIPMENT STICKING IN WELL | 2012 |
|
RU2520101C2 |
COMPOSITION FOR INSULATION OF THIEF ZONES | 2010 |
|
RU2431651C1 |
Authors
Dates
2001-06-27—Published
1999-01-19—Filed