FIELD: erection of main pipe lines used for transportation of gas or oil; repair of defective sections of main pipe lines. SUBSTANCE: pipe line is tested under pressure Ptest.; then this pressure is reduced and is maintained in the course of ballasting and filling the section under test, after which pressure is raised again to Ptest and section is again kept under this pressure. Invention contains mathematical dependence of pressure in pipe line on geometry of pipe line, material and operating conditions. EFFECT: enhanced operational reliability due to reduction of stresses in pipe walls during ballasting and pouring with soil. 1 dwg, 2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIR OF PIPE LINE DEFORMED BY BENDING | 1997 |
|
RU2134373C1 |
PROCESS TESTING WELDED MOUNTING JOINTS OR LOCAL SECTIONS OF PIPE-LINE FOR STRENGTH | 1999 |
|
RU2146359C1 |
METHOD OF RECOVERY AND TRANSPORTATION OF NATURAL GAS FROM FLOWERS AND BEES GAS AND GAS-HYDRATE OFFSHORE FIELDS | 1998 |
|
RU2198285C2 |
METERING ECONOMIZER | 1996 |
|
RU2121594C1 |
ROTARY PISTON PUMP | 1998 |
|
RU2186250C2 |
METHOD OF INTEGRATED PROTECTION AGAINST CORROSION OF ELONGATED STEEL CONSTRUCTION | 1996 |
|
RU2110615C1 |
METHOD OF PIPELINE REPAIR | 1999 |
|
RU2180718C2 |
HEAD ARRANGEMENT OF BORE-HOLE | 1996 |
|
RU2129204C1 |
PACKER | 1999 |
|
RU2165004C2 |
METHOD FOR CLEANING HIGH-PRESSURE GAS-COLLECTING RESERVOIRS | 1996 |
|
RU2119043C1 |
Authors
Dates
2001-08-10—Published
1999-06-25—Filed